My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000371
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:49:26 AM
Creation date
2/7/2019 8:47:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000371
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AS SYSTEM FIL E <br /> FIELD MONITORING DATA SHEETS <br /> Date [ `"1 t '0 3 Arrival Time <br /> Technician CA�2V Clt �t _ Departure Time <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9-4275, 2905 W Benjamin Holt Drive Serial # <br /> Stockton,California Max Amp Rating <br /> Sparge Blower 1 5 HP rotary vane air compressor Max Amp Rating <br /> Electrical Power 220v Elec Meter Reading 3i; Cc>b <br /> # K/O Barrels at Site Full V Empty <br /> PART B: SPARGE SYSTEM DATA <br /> System up/down upon arrival? k/6 (If down, please complete Part C) <br /> Hour meter Reading _ At time 71'00 <br /> A Previous hourmeter reading <br /> 3 3zL1 Z. 43- `' <br /> B Current hourmeter reading 0 Time/Date <br /> _Z C1-!& 0 3 <br /> C Current reading minus previous reading <br /> D Tata!hours since last O&M event <br /> E C/D X 100 96 Operability <br /> Report percent operability to site engineer prior to leaving site <br /> Flow Data Before Adjustment Final Ideal Ran e <br /> Total blower flow(cfm) <br /> Pipe Size 2° <br /> Pressure at blower/compressor(psi) <br /> Gauge Range 0-30 'D <br /> PART C.TROUBLESHOOTING (complete If system was down upon arrival at site) <br /> Give details of sy§tem status upon arrival <br /> Give details of work perlormed to troubleshoot the problem <br /> d <br /> fry Me n <br />
The URL can be used to link to this page
Your browser does not support the video tag.