Laserfiche WebLink
SITE VISITATION REPORT <br /> Project: ARCO 2133 Date: j p 1� Project No: 77BP.52133.04.0335 <br /> Name of Technicians(s) Rate Sch/Bill Code: 335 <br /> rrival Time: - Departure Time: �+. Did you call in? -Yew No <br /> Who did you call? � �,, <br /> Weather Notations: SLTN o OUDY RAIN SNOW Temperature: :..y F <br /> PURPOSE OF VISIT <br /> GAUGE WELLS SURVEY INSTALL EQUIPMENT <br /> BAIL SEPARATE-PHASE MONITOR VAPORS INSTALL SYSTEM <br /> SAMPLE AIS INF EFF SAMPLE CARBON OTHER: 13 <br /> X SYSTEM CHECK BATCH FEED1�_ <br /> SAMPLE WELLS EQUIPMENT REPAIR <br /> DRUM INVENTORY-NON <br /> WATER CARBONSTOTAL OPEN TOP <br /> SOIL EMPTY TOTAL BUNG TOP <br /> SAMPLE INFORMATION - ELECTRIC METER READING 9P <br /> SAMPLED: YES X NO PARAMETERS: <br /> LABORATORY: <br /> WATER SOIL CHAIN OF CUSTODY NO: <br /> AIR OTHER <br /> REMEDIATION SYSTEM <br /> FLOW TOTALIZER: AIR VELOCITY: <br /> FLOW RATE: T PID INF: <br /> %LEL: PID EFF: <br /> DESCRIPTION OF ACTIVITIES ON SITE AND NOTES <br /> WELL 1.13 Valve Position Pressure(psi) Flow(cfin) <br /> S-1 SJ <br /> e5a� . �- 4 r <br /> S-2 <br /> S-3 3 O? I •-� _3 ; _ <br /> S-4 9 4a - <br /> S-s <br /> S-6 1 <br /> S-s 9-: o �� <br /> S-9 <br />