Laserfiche WebLink
SITE VISITATION REPORT <br /> Project: ARCO 2133 Date: a Project No: 77BP.52133.04.0335 <br /> Name of Technicians(s) S`- � � i, _s.�. _ Rate Sch/Bill Code: 335 <br /> rrival Time* Departure Time: /Z1�'S Did you call in? Yes No <br /> Who did you call? <br /> Weather Notations: SUN CLOUD IN SNOW Temperature: � F <br /> PURPOSE OF VISIT <br /> GAUGE WELLS SURVEY INSTALL EQUIPMENT <br /> BAIL SEPARATE-PHASE MONITOR VAPORS INSTALL SYSTEM <br /> SAMPLE A/S INF EFF SAMPLE CARBON OTHER: <br /> X SYSTEM CHECK BATCH FEED <br /> SAMPLE WELLS EQUIPMENT REPAIR <br /> DRUM INVENTORY - NONE <br /> �-- WATER CARBON TOTAL OPEN TOP <br /> SOIL EMPTY TOTAL BUNG TOP <br /> SAMPLE INFORMATION - ELECTRIC METER READING C� 7-2 <br /> SAMPLED: YES X NO PARAMETERS: J 1 „ A <br /> LABORATORY: f <br /> WATER SOIL CHAIN OF CUSTODY NO: <br /> AIR OTHER <br /> REMEDIATION SYSTEM <br /> FLOW TOTALIZER: AIR VELOCITY: <br /> FLOW RATE: f, .7 PID INF: _ <br /> %LEL: PID EFF: <br /> DESCRIPTION OF ACTIVITIES ON SITE AND NOTES <br /> WELL 1.D Valve Position Pressure(psi) Flow(cfm) A151, <br /> S-1 <br /> S-2 . - <br /> S-3 Q,3 73; <br /> S-4 <br /> S-6 9,9 9 <br /> S-8L'- <br /> S-9 <br /> F; <br />