Laserfiche WebLink
r <br /> A ' <br /> SITE VISITATION REPORT <br /> Project: ARCO 2133 Date: 21�d� Project No: 77BP,52133.04.0335 <br /> Name of Technicians(s) �f��,�' �,,-,., � Rate Sch/Bill Code: 335 <br /> Arrival Time: Departure Time: /, a Did you call in? No <br /> Who did you call? <br /> Weather Notations: SUN CTOK <br /> RAIN SNOW Temperature: E; F <br /> PURPOSE OF VISIT <br /> GAUGE WELLS SURVEY INSTALL EQUIPMENT <br /> BAIL SEPARATE-PHASE MONITOR VAPORS INSTALL SYSTEM <br /> SAMPLE AIS INF EFF SAMPLE CARBON OTHER: <br /> X SYSTEM CHECK BATCH FEED <br /> SAMPLE WELLS EQUIPMENT REPAIR <br /> DRUM INVENTORY-NONE <br /> WATER CARBON TOTAL OPEN TOP <br /> SOIL EMPTY TOTAL BUNG TOP <br /> SAMPLE INFORMATION - ELECTRIC METER READING 7 �� <br /> SAMPLED: YES X NO PARAMETERS: <br /> LABORATORY: <br /> WATER SOIL CHAIN OF CUSTODY NO: <br /> AIR OTHER <br /> REMEDIATION SYSTEM <br /> FLOW TOTALIZER: AIR VELOCITY: <br /> FLOW RATE: �� 71 PID INF: <br /> %LEL: PID EFF: <br /> DESCRIPTION OF ACTIVITIES ON SITE AND NOTES <br /> WELL LD Valve Position Pressure(psi) Flow(cf n) v,,, r <br /> S-2 b7 <br /> S-3 C7,Q 3.57SZE ,i <br /> S-5 4 t> <br /> S-f <br /> S-8 <br /> S-9 , / Vis/ � •� r� - <br /> a �.e­cp <br /> r, <br />