Laserfiche WebLink
SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> sq <br /> Date Time of Arrival p v� <br /> Technician j` —r-c�a Time of Departure f�• �� <br /> Site Engineer_ Rusly E Benkosky Was Site Engineer or substitute contacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location 2908 Bernamin Holl Drive, Stockton, CA Station No ARCO#2133 Project No 77BP 43235 00 0190 <br /> Abatement Equip___Kato_x 100 cfm catalytic oxidizer w Serial No <br /> SVE Blower Turbotron, 10 H P Max AMP Rating 40 <br /> SPG Blower Tuthill,5 H P. MAX AMP Rating 20 2 <br /> Telemetry done <br /> Electrical Power 230V Single Ehase <br /> Elect Meter Reading <br /> Supplemental Fuel Ali electric system <br /> No of K/O barrels at site Full Empty <br /> PART B SVE SYSTEM DATA <br /> iSystem up or down upon arrival /l wI/�/ (If down please complete PART E) <br /> Hourmeter Reading At time <br /> 1) <br /> Flow Data Before Adjustment Final Ideal Ran e <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> K/O Content I <br /> Vacuum ® blower(in H2O) <br /> Gauge Ran 0-200 <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P.in H2O) <br /> Pipe Size <br /> Well Field Air Flow(A P.in H2O) <br /> Pipe Size <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size " <br /> 11) <br /> FID Data Without Carbon With Carbon Difference <br /> System Influent my before dilution <br /> System Influent my after dilutlon <br /> System Effluent my <br /> Field Instrument Used Last Calibrated <br />