Laserfiche WebLink
eSOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date _ Time of Arrival <br /> Technician Time of Departure �- <br /> Site Engineer Rusty E Benkosky _ Was Site Engineer or substitute CCa�o�tatted from field? <br /> Yes �'C No <br /> PART A GENERAL INFORMATION <br /> Site Location 2908 Benjamin Holt Drive,Stockton,CA Station No ARCO#2133 Project No 77BP,43235 00 0190 _ <br /> Abatement Equlp atox 100 cfm catal is oxidizer Serial No <br /> SVE Blower Turbotron 0 H P Max AMP Rating 40 <br /> SPG Blower Tuthill.5 H P MAX AMP Rating 202 <br /> Telemetry h[gae__ _.. <br /> Electrical Power 230V Single-Phase <br /> Elect Meter Reading �� g <br /> Supplemental Fuel All electnc system <br /> No of K/O barrels at site Fuller Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival 104244//L �'� (If down please complete PART E) <br /> Hourmeter Reading At time <br /> Flow Data Before Ad ustment Fina! Ideal Ranne <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> WO Content sl <br /> Vacuum ® blower(In H2O) <br /> Gau a Ran a 0-200 <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,In H2O) <br /> Pipe Size 0 " a L <br /> Well Field Alr Flow(A P,in H2O) <br /> Pi Size X <br /> Dilution Air Flow(A P."H2O) <br /> Pipe Size 0 " <br /> li} <br /> FID Data Without Carbon With Carbon Difference <br /> System Influent my before dilution <br /> System Influent my after dilution <br /> System Effluent my <br /> • Field Instrument Used Last Calibrated <br />