Laserfiche WebLink
Ms. Lori Duncan S E C O R <br /> May 27, 2005 <br /> Page 5 <br /> Sincerely, <br /> SECOR International, Incorporated <br /> J� <br /> ���pAl. GES f <br /> Brian Carey <br /> Associate Geologist 1�a� <br /> lq <br /> Diane Barclay, C.H.G. OF C <br /> Senior Geologist <br /> Attachments: Table 1 — Soil Borings and Well Completions <br /> Figure 1 — Site Location Map <br /> Figure 2 — Site Plan with Proposed Boring Locations <br /> Figure 3 — Detailed Site Plan of Chevron Facility <br /> Figure 4 — Detailed Site Plan of ARCO Facility <br /> Attachment 1 —SJCEHD letter dated March 7, 2005 <br /> Attachment 2 — Field and Laboratory Procedures <br /> 0 <br /> cc: Darin Rouse, ChevronTexaco Environmental Management Company, <br /> San Ramon, California <br /> Paul Supple, Atlantic Richfield Company, Moraga, California <br /> Marcus Pierce, California Regional Water Quality Control Board —Central Valley <br /> Region, Sacramento, California <br /> Eric Holm, Delta Environmental Consultants, Inc., Rancho Cordova, California <br /> • <br />