My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000403
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 10:08:16 AM
Creation date
2/7/2019 9:07:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000403
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> AS SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> p <br /> Date / 3 Arrival Time J <br /> Technician Departure Time � 0 <br /> PART A GENERAL INFORMATION <br /> Site Location Chevron 9-4275, 2905 W Benjamin Holt Drive Serial # <br /> Stockton,California Max Amp Rating <br /> Sparge Blower 1 5 HP rotary vane air compressor Max Amp Rating <br /> Electrical Power 220V Elec Meter Reading <!5 g gr <br /> # K/O Barrels at Site Full Empty <br /> PART B: SPARGE SYSTEM DATA /� <br /> System) up/down upon arrival'2 ale, (If down, please complete Part C) <br /> Hour meter Reading / At time C] f 7 <br /> A Previous hourmeter r eading (previous) <br /> 8 Current hounneter reading 0 Time/Date <br /> C Current reading minus previous reading j 7 <br /> D Total hours since last O&M event <br /> E C/DX100 % <br /> biliReport percent operability to site engineer prior to leaving site <br /> Flow Data Before Ad ustment Final Ideal Ran e <br /> Total blower flow(cfm) <br /> Pipe Size 2" 1 <br /> Pressure at blower/compressor (psi) � C <br /> Gauge Range 0-30 J <br /> PART C- TROUBLESHOOTING (complete If system was down upon arrival at site) <br /> / <br /> Give details of system status upon arrival AX ... >C'_// 42;7 <br /> e details of work performed to troubleshoot the problem <br />
The URL can be used to link to this page
Your browser does not support the video tag.