My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:10 PM
Creation date
2/7/2019 10:31:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOREHOLE DRILLING <br /> Boreholes are drilled by a licensed drilling subcontractor, using a truck-mounted drilling rig <br /> equipped with nominal 6-inch-diameter:hollow-stem augers. Boreholes are drilled by continuous <br /> coring to a predetermined depth below the ground surface, or to groundwater, whichever is <br /> encountered first. Borehole depths are based on site conditions, including but not limited to <br /> conditions such as depth to water, topography, and depth to bedrock. Borehole depths also may <br /> be governed by obtaining two readings on a photoionization detector, or equivalent instrument, <br /> which are less than 50 parts per million above the background reading, in which case the <br /> borehole is terminated. <br /> At the end of the drilling and sampling operations, boreholes are immediately backfilled <br /> from bottom to top with a bentonite/cement slurry pumped through a tremie pipe. <br /> To prevent cross contamination during drilling, all equipment is steam cleaned prior to and <br /> between use at each borehole. <br /> Soil sampling and monitoring procedures during borehole drilling are described in a separate <br /> appendix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.