Laserfiche WebLink
a' -i � >rr ,w4? �k ',.tr" r"«�'wy"r ,�� -'r"�.,: t -th';rC ,"=�'�„ �4"S' s ,✓'."" ,r <br /> k <br /> �rr� /� y 1`'�l•�:�� ,�`.� ,.. � _,-P F -.,;�t�a r t� oat err p,}�J�„L-wSy � ,-� r, .r�irrr k. V�'_:,r& �.4 �� .`.'la, t i�� .!`��b�Y"1� �1�' §-', /-, - <br /> S �lZ� F 4i :.-..3. L -:9 :::y' _��: 1'-'r.1,�F 1 yt .sM�.Y�.,4�,,h,„ l.di" ry y� TtY�,rid''1 3 +4Fa*f"'�_'y�; `"��,�T�'r .P'R"v�� wr14'.4 '�+•hu 1' <br /> 'Y 'L; .. .r ,.,,,.... .r- 1,•. f-,.-:sirF�-y:� F..ct�- -,�R r,,,� �'r5��ry'�5.-,r'k r ...'�jw "F� <br /> i�RaY,y <br /> CI(APTER 1 <br /> INTRODUCTION <br /> On May 24 3984. a broken <br /> PC On <br /> Company (ARCO tank leak detector Benjamin bolt Drive i ) Service station 2133 at ARCA Petroleum <br /> -leak from n Stockton, California located at 2908 <br /> the underground Stora resulted in a <br /> amount of gasoline storage tank <br /> system. <br /> gasoline <br /> Gettle£--Ryan lost are between Estimat,�s of the <br /> unde • Inc_ (GR) jr and Emeon 2,000 and 3,200 <br /> underground tanks and surrounding A sociaw Q_ s EMCON gallons. <br /> all Piping, and <br /> s g soil � --) voted the <br /> g eantamination installed new tanks <br /> operated a remedial-actp,an at Cie site �, tested <br /> involvement at and recover and installed and <br /> 1987 this site was terminated b System, GR <br /> ARCC retained Brown and Caldwell by ARCO, and and EMCON's <br /> OE the Contamination (BC) to in late January <br /> the site to xnatxon at the site investigate the <br /> acceptable and to prepare std-us <br /> a plan to clean `r.tp <br /> Previous In v eesti ations <br /> GR and EMCON inst, <br /> site. The system consisted and operated the <br /> wells and a of a number of Lecovery system on <br /> free recovery well groundwater rrronitoring <br /> Floating product a equipped with u petrapur9e u <br /> The recovery system worked a hydropurge P mP to remove <br /> Shallow a to pull Pump to remove groundwater. <br /> aquifer toward the recovery groundwater and product the <br /> from the recover The fluid was ,from <br /> product was recovered elI to a Separator tank t�'-n pumped <br /> was thea disc The groundwater , where free floatin <br /> discharged into the municipal Pumped from the g <br /> P l sanitar recovery well <br /> A plat Y sewer system. <br /> is plan of the site <br /> shown an Figure 1_2. including underground <br /> wells (E_2 throu The locatigns utility locations <br /> and the recover gh F-12) , backfill °f groundwater monitoring <br /> y.well are shown on monitoring wells (A, B, C, and U , <br /> E'igure 1-3- <br /> The details of their i if <br /> shown in the nvestigati-on and of the <br /> by EMCON for Remedial Action Evaluation report, Tecover r <br /> GR (ApF.9 dix A} , A Y sy„tem are <br /> P <br /> roduct were recovered b Pproxxmate Y 600 gallons <br /> 1956, Prepared <br /> gallons of Produci recav red e Sys in addition to lions of floating <br /> underground s during excavation an estimated 500 <br /> forage tanks, and l <br /> repacement of <br /> �. the <br /> Following the removal o <br /> PunaP was reMOVed from th £ most floating product <br /> remove water containin e recovery well. The the petrcpurge <br /> water into g dissglved h System canti.nued to <br /> the. . r,,unicipal ydrocarbons and to dischar <br /> discharge permit sanitary Sewer ge that <br /> Control 1'aci3it was issued by the Sys tem. <br /> A wastewater <br /> Y in August 1984- The permit expired Regional <br /> August Wastewater, <br />