My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012553
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:10:23 PM
Creation date
2/7/2019 11:05:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012553
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wax^+ � ��`a ... - •« tee ^' - � - - µr' -., aC.K�- u*;.� � .,. °1... �+ <br /> Pt <br /> Mr. Kyle Christie <br /> June 29, 1959 <br /> Page ; � � <br /> JUL � 1999 <br /> Conclusions ENVIRONMENTA+HEALTH <br /> QERMITISERVICV <br /> Groundwater samples collected during the Winter quarter 1989, show that benzene <br /> concentrations arc increasing in wells E-2, E-5, E-8, E-9, E-]0, and E- <br /> could be t 12. This increase <br /> he result of two factors: (1) contamination is being pulled by the recovery system <br /> toward the site from another source. A Chevron station, located north of the site, across <br /> Benjamin Holt Drive, has a confirmed soil contamination and suspected groundwater <br /> contaminatiou problem; and <br /> aforementioned Che+•rort station)has cbeen�underoconstruction ubilized recently. <br /> cTheentirc stafII tile tion was 1' 3 <br /> demolished and the asphalt covering the lotwas removed. This has increased rain water <br /> access to contaminated soil, and therefore, caused the solubilixation of product from the soil <br /> into the groundwater. <br /> The BETX concentrations in well PR-1 have decreased-to nondetectable since the fall quarter <br /> 1988. BETX was nondetectable in well PR-I for all quarterly sampling events prior to the <br /> fall quarter 1988. This one-time occurrence of BETX is represantative of a samp lin <br /> or cross contamination during the sampling of well PR-I in th-; fall quarter 1988. b error <br /> Recommendations <br /> Continued quarterly monitoring of the site is recommended. Monitoring wells PR-I, BHD_1, <br /> E-2, E-5, E-8, E-10, E-11, and E-12 should be sampled on the new quarterly schedule, which <br /> begins in May 1989. <br /> Very truly yours, <br /> BROWN AND CALDWELL <br /> Phillips <br /> �r <br /> Proj Manager <br /> " LEP:PYD:mkw <br /> Enclosure <br /> cc/enc: Ms. Laurie Caiulla, San Joaquin County Health Department <br /> Mr. John Randall, Chevron <br /> Mr. Chris Winsor, ARCO Products Company <br /> BROWN AND CALDWELL <br /> 723SSTREET SACRALMENTO•GWFORNN 92 r916) /4•0123 '' �\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.