My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012556
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 11:41:34 AM
Creation date
2/7/2019 11:15:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012556
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RI, go RINArZ <br /> w _ <br /> 5 NO <br /> wmlw� ...;� <br /> -WE--, <br /> y <br /> k <br /> a <br /> FM Fi:fluun and Caldwell <br /> b' <br /> JUN 3 <br /> May 29, 1991 EN'V;,",:'WgNIENT'n'L F;'EALTi-i <br /> rL RY,i1 /S4f�a4.-J <br /> Mr. Chuck Carmel <br /> ARCO Products Company <br /> Post Office Box 5811 017-5590-34i1 <br /> San Mateo, Califomia 94402 <br /> Subject: 1991 First Quarterly Report for ARCO Station 2133,2908 Benjamin Holt Drive, <br /> Stockton, California <br /> Dear Mr. Christie: <br /> This report presents the first quarterly water levels and analytical <br /> 2133,lesulted ats of g groundwater <br /> water sam Hog <br /> performed at ARCO Products Company (ARCO) Station <br /> Drive in Stockton,California. The work was performed on February 11, 1991 through February <br /> ugh E-12 and <br /> 14, 1991,under Task Order 2133-91-5A. There are fifteen on-site welly durin oth s sampling <br /> PR-1, PR-2, BHD-=, and BHD-2(Figure 1). Twelve wells were same g <br /> E-3 and E-6 were dry and Fere not sampled. Access to well E-2 was <br /> event. Two of the wells, led, This re ort describes the results of monthly <br /> obstructed by a vehicle and could not be sampled. P <br /> monitoring of groundwater elevations, which occurr4d on February 11, 1991. <br /> Field and Analytical Methods <br /> Brown and Caldwell personnel measured depth-to-water levels,supervised purging of each well, <br /> at the site. Refer to Exhibit A for detailed field methods <br /> and collected groundwater samples <br /> description. <br /> All groundwater samples were analyzed for total petroleum hydrocarbons (TPH) and benzene, <br /> All groundwater <br /> toluene,and xylenes(BETX)by Modified U.S.Environmental Protection Agency <br /> Method 801515030. <br /> Results <br /> The groundwater flow direction is to th=le els measured on February hydraulic-northwest, The 1991,%itth those <br /> approximately 0.003. Comparison of the Ovate significant change in the general groundwater flaw <br /> measured in September 1990 in no sig <br /> direction or hydraulic gradient. Figure 1 shows the water-level elevations and flaw direction <br /> calculated from the February 11, 1991 data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.