My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012556
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 11:41:34 AM
Creation date
2/7/2019 11:15:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012556
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ow <br /> Mr. Kyle Christie <br /> January 14, 1991 <br /> Page 12 <br /> groundwater <br /> in late April 1988,the groundwater flow direction was inf1rd treduce <br /> du eetIavels of <br /> Beginning . of the remediation system designed recovery pump stopped - <br /> recovery system installed <br /> as rel 1989.the sec rY <br /> und�vatrr• Sore*".time in/ P of the recovery systetti'is now <br /> petroleum constituents in the gro R9p <br /> operating. I he malfunction was dotecu%d in June • of the pump. <br /> te, The recovery system was experiencing unexplained fluctuations in the lower explosive <br /> comple well and controlled operation <br /> level(LEL)meter,which was located in the wove of fluctuations of vaPors within the recovery <br /> The fluctuations have been shown to be also installed as required by the <br /> re the LEL meter was relocated to the yell vault,and there has been no abnormal <br /> well. There product separator tank discharge <br /> LEL readings since relocation• p► p ret PWD)as a final treatment metlt�of the wells for <br /> City of Stockton Public Works Dere has not been free product identified in any being reissued. <br /> to the sanitary <br /> sewer system. Y currently <br /> ears. permits for discharge from the Cit of Stockton P• are <br /> several y <br /> System startup should occur in January 1991. <br /> Conclusions a and are partially filled <br /> Emcon are generally very slow to recharge <br /> vela to provide accurate v+�r <br /> Monitoring wells installed by well has been <br /> The cause of LEL meter fluctuations in thce recovery„em has been <br /> with silts and clays in some cases. These wells should be cede ; <br /> quality and water-level data a to the sanitary sewer. <br /> identified and the LEL meter has been City <br /> ofedock on P well for di�harg,very' tem can be <br /> tden uirements of the Ciry of,5 the recovery Sys <br /> modified to meet req ermits by the City of Stockton PWD, the nort}teast. <br /> Pending final approval of p groundwater movement is to <br /> reactivated. Under static conditions,the direction of .0123. <br /> Please direct any questions regarding this project to me at(916,444 <br /> Very truly yours, <br /> BROWN AND CALDWELL <br /> Steven D. Misner , <br /> Project Manager <br /> SDM:SP:mkw <br /> Enclosure County Department <br /> cclmc: Ms.Laurie Cotulla,San neon qui.n Health Dep <br /> Mr.John Randall,Che <br /> Mr.Chris Winsor, ARCO Products Company <br /> 4 <br /> grown and Caldwell <br />
The URL can be used to link to this page
Your browser does not support the video tag.