My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012556
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012556
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 11:41:34 AM
Creation date
2/7/2019 11:15:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012556
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> 8town anti Caldwell <br /> Cunsuitants <br /> :rzrrerta <br /> •r�aaa�^3 <br /> =a<C}161 a.1s3" <br /> January 20, 1992 JAN 2 3 1992 <br /> CNV)R1.;!9f0CNTAL l'::•l.TF1 <br /> PERMIT/SERVICES <br /> Mr. Cm k Carmel <br /> ARCO Products Company <br /> 20M Alameda de las Pulgas <br /> Post Office Box 5811 017-5690-03/1 <br /> San Mateo,California 94402 <br /> Subject: Status of Groundwater Extraction System, ARCO Station 2133, <br /> Stockton,California <br /> Dear Mr. Carmel: <br /> ' This letter presents the current status of the groundwater extraction system and the results of the <br /> groundwater discharge sampling at ARCO Products Company (ARCO)Station 2l33,1G^ated at ; <br /> 2908 Henjanxin Holt Drive in Stockton, California. Listed chronologically is a summary of the <br /> activities related to the discharge of groundwater at the site from November 16 tl.rough_ <br /> December 15, 1991. Table 1 presents a summary of the artected constituents for the extta:ti��i; <br /> system to date. <br /> The groundwater extraction system was not operating continuously during this reportkig period <br /> of 30 days. As stated in the December 16, 1991 status letter the extraction system flcSv rate was <br /> decreased to 5.5 gallons per minute(gpm)from 10.5 gpm because the zone of capture Was larger <br /> than needed. The decreased flow.in the discharge piping allowed sewer gases from,*e sewer ' <br /> main to migrate back ug to the point where the lower explosive limit(LEL)exceeded 10 percent <br /> -which tamed the system off. <br /> 'Cite LEL sensor was checked and calibrated,and the system restarted. The system again turned <br /> off due to a high LE alarm after approximately 2000 gallons were discharged. The LEL sensor, <br /> has been relocated so that it monitors explosive gases in the headspace of the above'gxourl <br /> holding tank: In this location the LEL sensor monitors gases that are more representative of <br /> gases being;discharged to the see-t:r. The system was restarted on December 2D, at 5 gprrt,and <br /> has been operating since then. Tile system was sampled for TPH-G/BETX, metals, and total <br /> toxic organics on January 8, 1992. The results of this sampling will be included in the next <br /> -;� status report (covers December 16, 1991 through January 157 1992). <br /> ;•lc� t �e�- 1 5 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.