Laserfiche WebLink
, I <br /> nP <br /> i <br /> Mr. Chuck Cannel <br /> October 9. 1991 <br /> Page 3 <br /> lbs da <br /> Total Xylenes <br /> 6/12-6/26 23 0.0028 <br /> 6/27-7/10 22 0.0027 <br /> 7/11-7/24 27 0.0033 <br /> 7/25-8/1 19 0.0023 <br /> 8/2-8/21 47 0.0058 <br /> 8/22-9111 <0.5 <6.0001 <br /> The next monthly status letter willincEude the interval September 16 through October 15, 1991. <br /> Please call Mr. Steve Misner at {916} 444-4123 if you have any ques:ians regarding the <br /> groundwater extraction system at ARCO Station 2133. <br /> Very truly yo», <br /> BROWNAND CALDWELL <br /> Steven D. Misner <br /> Project Manager <br /> SDM.mkw <br /> Enclosure <br /> cc: Mr.aim Maughan* California Regional Quality Control Board <br /> Ms.Mary Meays,San Joaquin County <br /> Mr. Frank Tucker,City of Stockton <br /> Mr. Cl'ds Wirisor,ARCO Products Company <br /> 4 <br /> Brown and Caldwell <br /> �crsu�tants . <br /> ti, , <br />