Laserfiche WebLink
Ms Laurie Cotulla <br /> July 30, 1993 <br /> Page 2 <br /> As of July 16, 1993, BC has not received a letter from CalTrans Based on the conversation <br /> with Ms Meays, ARCO is proposing to install a monitoring well on the western side of the <br /> ARCO site as an alternative to the CalTrans well Figure 1 presents the proposed location of <br /> this well Upon receipt of the CalTrans letter, we will send a copy of it to the County <br /> Appendix A of this letter contains written documentanon of the CalTrans contacts including <br /> a March 17, 1993, letter to CalTrans requesting permission to dell <br /> We have not been able to contact the owners (including Lil Val, Inc ) of the property located <br /> south of the ARCO Station to request permission( to drill one soil borehole on this property <br /> The owners of the property where ARCO needs to drill are absentee landowners, and we <br /> anticrpate it will take some rime to find them BC will continue to pursue access to flus area. <br /> Item 3 is an inquuy of the screen interval for the soil vapor extracnon wells The screened <br /> interval will be from the bottom of each well (approxmmately 25 feet below ground surface) <br /> to 5 feet below ground surface <br /> Appendix A of the work plan was incomplete. Appendix B of this letter is a revised field <br /> methods section to be used during the field activines. <br /> A permit application and fee will be forthcoming for the urstallation of the wells. BC <br /> anticipates beginning the fieldwork upon County approval of this work plan and receipt of <br /> _landowner permission <br /> If you have any questions or comments, please call me at (916) 444-0123. <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> Steve Misner <br /> Project Manager <br /> SDM.jrb <br /> Enclosure <br /> cc: Mr. Chuck Carmel, ARCO Products Company <br /> Mr Jay Lucas, Brown and Caldwell <br /> Brawn and Caldwell <br /> Corsu, a"is 73SS�catRl 7323-AL2 <br />