Laserfiche WebLink
SOIL VAPOR EXTRACTION SYSTEM . <br /> FIELD MONITORING DATA SHEETS <br /> Date `' Time of Arrival <br /> Technician Time of Departure y <br /> Site Engineer Rusty E.Benkosht _ Was Site Engineer or substitute contacted from field? <br /> Yes _ No <br /> PART A GENERAL INFORMATION <br /> Site Location 2908 BenlamIn_Holt-Drive.Stockton,CA Station No., ARgO„#21,,u— Project No 77BP.43235,00.0180 <br /> Abatement Equip.. Katox 100 cfm g&t_alvtio oxidizer Serial No <br /> SVE Blower Turbotron. 10 H.P. _ _ Max AMP Rating _40_ -- <br /> SPO Blower Tuthill.5 H.P. _ MAX AMP Rating <br /> Telemetry._.None- .. <br /> Elect Meter Reading <br /> Electrical Power 230V Sinale Phase <br /> 3� <br /> Supplemental Fuel All electric system <br /> No of K/O barrels at site Full Empty <br /> PART B-SVE SYSTEM DATA <br /> System up or down upon arrival �r -(If down please complete PART <br /> Hourmeter Reading At time <br /> Flow Data _ -Before Ad ustment Final Ideal Ran -= — <br /> %Dilution air valve open <br /> %Recirculation valve open <br /> WO Content al — -- _ -- -- - - ----— -- <br /> Vacuum ® blower(in H2O) <br /> -Gauge Ran 9 0-200 <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,In H2O) <br /> Pipe Size 0 3” <br /> Well Field Air Flow(A P,In H2O) <br /> Pipe Size 0 " <br /> Dilution Air Flow(A P,'H2O) <br /> Pi a Size <br /> li) <br /> FID Data Without Carbon With Carbon Difference <br /> System Influent my before dilution <br /> System Influent my after dilution <br /> System Effluent my <br /> Field Instrument Used last Calibrated <br />