Laserfiche WebLink
, A <br /> SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date Time of Arrival <br /> Technician Time of Departure - � <br /> Site Engineer Rusty E Benkosky„.„ Was Site Engineer or substitute contacted from fie�1? <br /> Yes No x <br /> PART A GENERAL INFORMATION <br /> Site Location 2908 Ben in Holt Drive,Stockton,CA Station No ARCO#2133 _ Project No 77BP 43235 00 0190 <br /> Abatement Equip.,-Katox 100 cfm galtalytic oxidizer Serial No <br /> SVE Blower Turbotron. 10 H P. Max AMP Rating 40 <br /> SPG Blower Tuthill,5 H.P MAX AMP Rating ..20,2_____ <br /> Telemetry_None <br /> Electrical Power M Single Phase Elect Meter Reading <br /> Supplemental Fuel All electric s ste <br /> No of K10 barrels at site Ful! Empty <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival �4 �5� (If down please complete PART E) <br /> Hourmeter Reading At time <br /> I) <br /> Flow Data Before Adjustment Final Ideal Ran e <br /> %Dilution air valve open <br /> %Recirculation valve o en <br /> K/O Content a! <br /> Vacuum ® blower(in H2O) <br /> —Gauge Range 0-200 <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P, in H20) <br /> Plea Size 03” ZX/__ <br /> Well Field Air Flow(A P,in H2O) <br /> PIU Size <br /> Dilution Air Flow(A P."H2O) <br /> Pi a Size 2" <br /> li) <br /> FID Data Without Carbon With Carbon Difference <br /> S stem Influent my before dilution <br /> System Influent my after dilution <br /> S stem Effluent my <br /> • Field Instrument Used Last Calibrated <br />