My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000434
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:58 PM
Creation date
2/7/2019 1:47:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000434
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> REMEDIAL SYSTEM PERFORMANCE EVALUATION <br /> Soil vapor extraction (SVE) and air sparging were initiated on January 1, 1995 and May 5, 1995, respectively <br /> A groundwater extraction system operated at the site between 1991 and 1996 A brief description and <br /> performance evaluation of the remedial system between ,dune 29, 2000 and September 27, 2000 is presented <br /> below <br /> SVE System <br /> The SVE system is comprised of 14 SVE wells (V-1 through V-13, and E-6) and an Airex Katox 100 catalytic <br /> oxidizer The SVE system is permitted by the San Joaquin County Unified Air Pollution Control District <br /> (SJVUAPCD)Permit to Operate Number N-3601-1-0,which expires on January 1,2001 <br /> The SVE system was re-started on March 15, 2000 after being off due to high groundwater elevations making <br /> operation of the SVE system not feasible The SVE system was approximately 76 percent operational this <br /> quarter Downtime associated with the SVE system operation was due to a power failure that shut the system off <br /> during the month of July SVE system influent data is presented in Tables A-1 and A-2, and a plot of SVE <br /> system influent soil vapor TPHg,benzene,and MtBE concentrations versus time is shown as Figure A-2 A plot <br /> of cummulative mass removal data is presented in Table A-i During the third quarter of 2000,the SVE system <br /> removed 65 4 pounds of gasoline and 0 8 pounds of benzene and 2 1 pounds of MtBE from the soil beneath the <br /> site SVE system performance data is included in Table A-1 SVE emission data is presented in Table A-3 and <br /> SVE operational data, including well open/closed status, flow rate, and applied vacuum data are presented in <br /> Table A-4 <br /> Air Sparging System <br /> The air sparging system is comprised of 9 air sparging wells (S-1 through S-9) and a MD Pneumatics Model <br /> 3202 7 5-horsepower blower During the third quarter, the air sparging system was fully operational Aw <br /> sparging system operational data, including well open/closed status, flow rate, and applied pressure data are <br /> presented in Table A-5 Momtonng well dissolved oxygen data is included with groundwater elevation and <br /> analytical data(Table 1) Treatment system field data sheets are included as Attachment A-A <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.