Laserfiche WebLink
FIELD DATA SHEET <br /> WATER SAMPLE FIELD DATA SHEET" '�� ����G�Y"��"':������`ti �'�' ��� •-�-- <br /> PROJECT No - ZT LOCATION- WELL ID it. <br /> . D33- SrxGron <br /> CLIENT/STATION No _ / _ FIELD TECHNICIAN �9u[- <br /> E' <br /> WELL INFORMATION CASING GA <br /> Depth to Liquid TOB r TQC DIAMETER LINEAR FT SAMP <br /> Depth to water al.l Z_TOS x-8`7 TOC ❑ 2 0 17 [ Crour,dw LE YPE <br /> aw <br /> Total depth TOB Z? _TOC a 0 38 ❑ Duplccate <br /> Date. G./6-% Terre (2.400} 113 Leff 4 066 ❑ FxtraCtion well <br /> ❑ 4 5 9-81 _ ❑ Tnp blank <br /> ftolx TrPt ❑ OcVWater interface ❑ S 1 02 ❑ Field blank <br /> &M Electronic indicator Z ❑ 6 #1 ❑ Equipment blank <br /> 1� ❑Other; ❑ 8 26 ❑ Other,�� <br /> t <br /> Gal/Lincar Number of Calculated <br /> TD ZZ �b- DTN/ (3 63 x Foot . .3e = • "7 x Casings 3 Purge 1-)•S3 <br /> ------------- <br /> DATE PURGED. G./$ 94, START: END (2400 hr) / %L1 PURGED BY: e <br /> DATE SAMPLED: (0-IR 96 START: t '' END (2400 hr) �[. )—D_,SAMPLED BY: I�LcJ <br /> TIME VOLUME pH EG TEMPERATURE <br /> 2400 hr (ml- lRaM Lrrmhos/cm 0 2 5_ (:B COLOR TURBIDITY ODOR <br /> Sz;- "1,30 1,lAo — � s � <br /> c y. /0-1�b -7,Z(P f loo �� S <br /> Pumped dry <br /> FIELD MEASUREM T TIME OF SAMPLEr AFTER RECHARGE: <br /> DTW: n 1 T S/TOC <br /> PURGING EQUIPMEivT I D d SAMPLING EQUIPMENT/I D <br /> ❑ Bader - 11 Airlift Pump Bailer. Z3- _ <br /> R(Centrifugal Pum _*p- /) 0 Dedicated ❑ Dedicate <br /> ❑ Other ❑ Other <br /> EAMP CNTRL 4 D_ ITE TIME(2400) t!o of Cont- SIZE CONTAINER RESERVE ANALYTICAL PARAMMR <br /> 1 '-/8 41 <br /> REMARKS <br /> stCNAruRE <br />