My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000453
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:44:59 PM
Creation date
2/7/2019 2:08:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000453
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO PRODUCTS COMPANY SOIL VAPOR EXTRACTION SYSTEM OPERATING REPORT <br /> FIRST QUARTER 1996 <br /> • <br /> Facility# 2133 <br /> Facility address 2908 Benjamin Holt Dr Stockton,CA <br /> ARCO engineer Mr Kyle Christie <br /> Consultant[project manager] Brown and Caldwell [Steve Misner,(916)4440123] <br /> Lead agency San Joaquin County Health Department <br /> Reporting period 12/15/95 -3127/96 <br /> Equipment inventory Airex KATOX 100 <br /> catalyst module <br /> 10 Hp Baldor motor 240VAC/1 phase <br /> Gast oilless regenerative blower <br /> ATI telemetry system <br /> Knockout pot <br /> MD pnumatics sparge blower <br /> Operating mode Catalytic oxidation <br /> AQMD Permit#,AN N-78-3-0 <br /> End of period date 3/27/96 <br /> TPH cone end of period(PID,ppmv) 103 <br /> Benzene cont end of period(Lab,ppmv) NA <br /> • Flowrate end of period 100 cfm <br /> Sod vapor extraction system <br /> HC destroyed this period(FID,lbs) 144 <br /> Operating hours this period 839 <br /> Percent up time 34% <br /> Air sparging system <br /> Operating hours this period 839 <br /> Percent up time 34% <br /> Total system operating hours to date 7,812 <br /> Attachments: <br /> Table 1 Soil Vapor Extraction and Treatment System Influent Data <br /> Table 2 Soil Vapor Extraction and Treatment System Effluent Data <br /> Table 3 Soil Vapor Extraction Well Data <br /> Table 4 Air Sparging Well Data <br /> Table 5 Dissolved Oxygen Concentrations <br /> Chart 1 TPH-G Concentrations vs Time,SUET System <br /> Chart 2 Cumulative Hydrocarbons(as TPH-G)Removed vs Time,SUET System <br /> Assumptions <br /> I The quantity of hydrorubons removed was estimated using the influent TPH concentrations <br /> at the oxidizer inlet <br /> 2 Percent up time was calculated by dividing actual operating hours as determined from hourmeter <br /> readings by the total hours of the reporting period <br /> 3 Source flow process flow,and source vacuum are based on averages established during site visits <br /> CE 1aRCO5M\workcopy�6196NvES2133xtvey <br />
The URL can be used to link to this page
Your browser does not support the video tag.