Laserfiche WebLink
ARCO PRODUCTS COMPANY <br /> Groundwater Extraction System (GWES) Operating Report <br /> First Quarter 1996 <br /> Facility t# 2133 <br /> Facility address 2908 Benjarnin Holt Dr,Stockton CA <br /> ARCO engineer Mr Kyle Christie <br /> Consultant[project manager] Brown and Caldwell[Steve Misner, (916) 444-0123] <br /> Reporting penod 12/15/95-3/15/96 <br /> Equipment inventory 3/4 Hp submersible pump w/clarifier tank <br /> Groundwater extraction control panel <br /> BC telemetry panel <br /> Status for the reporting period <br /> The OWES began continuous operation in April of 199I The system was operated through Febuary 14, <br /> I996 at which time it was shutdown indefinitely The OWES equipment remains on-site should ground <br /> water treatment resume <br /> End of period date 3/15/96 <br /> Net volume treated this penod 355,834 <br /> Average flow rate for penod 24 <br /> HC removed this period 190 <br /> Total free product removed to date 42 gallons <br /> . Attachments <br /> Table I Groundwater Extraction System Data <br /> Chart 1 TPH-G and Benzene Concentrations Vs Time,GWES <br /> Chart 2 Cumulative Hydrocarbons(as TPH-G) Removed Vs Time,OWES <br />