My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001346
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0001346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:33:06 PM
Creation date
2/7/2019 2:43:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001346
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron EMC Retail & Terminal Business Unit <br /> BOREHOLE CLEARANCE REVIEW <br /> (Specific for service station assessments) <br /> • Chevron Site# Protect# 774f{ fY27d-, - <br /> BorehoIe#s Reviewed i✓ Date Z/o Ap, <br /> Clearance Inspected by l ft � Reviewed by <br /> Yes No (Contractor/Consultant Rep)� (Contractor/Consultant PM Initial) <br /> ❑ l Is a scaled site plan showing the proposed borehole locations attached to this form? <br /> ❑ 2 Are all of the proposed borehole locations at Ieast 5 feet from any subsurface utilities(including product <br /> lines)shown on Chevron's building plans? <br /> ❑ 3 Are all of the proposed borehole locations at least 7 feet from the pad surrounding the underground <br /> storage tanks(USTs)shown on Chevron's building plans? <br /> ❑ 4 Are all of the proposed borehole locations at least 5 feet from any subsurface utilities shown on public <br /> right-of-way street iw6ovement plans? <br /> PM to check here El if applicable to this,lob <br /> ❑ 5 Does the station manager have any knowledge of any subsurface utilities within 5 feet of the proposed <br /> borehole locations? (Review locations with the station manager) <br /> ❑ 6 Are all of the proposed bo hole locations at least 5 feet from any subsurface utilities identified during a <br /> geophysical surve ? <br /> PM to check here 12rif applicable to this fob <br /> L ❑ 7 Have all underground service alert providers notified by USA marked out their facilities in the vicinity <br /> of the borehole locations or otherwise notified EMC'S Contractor/Consultant that they do not have any <br /> facilities near the proposed borehole locations? <br /> • <br /> ❑ 8 Do any of the proposed borehole locations lie on a line connecting two similar looking manhole covers? <br /> ❑ 9 Do any of the proposed borehole locations lie on a line perpendicular to the street from the water,gas, <br /> and electrical meter? <br /> ❑ 15�r 10 Has the pavement in the vicinity of any of the proposed borehole locations subsided or does it give the <br /> appearance it may be covering a former trench? <br /> ❑ I 1 Do any of the proposed borehole locations lie beneath overhead utility Imes or canopies that may <br /> interfere with the drilling rig? <br /> i <br /> ❑ 12 Have all appropriate permits been obtained? <br /> ❑ ❑ 13 Have you carefully cleared the hole(using an air knife,hand auger,or other mechanical methods)to a <br /> minimum depth of 8 feet below grad before using the drill rig? <br /> ❑ ❑ 14 Is the diameter of the hand cleared hole greater than the outer diameter of the drilling tools you will be <br /> using(at least 120%the drilling tool diameter)? <br /> ❑ ❑ 15 ,.Does the soil you encountered in the cleared hole consist of clean gravel,Glean sand,aggregate base :;-, 5#r .r; <br /> (gravelly sand with---10%fines),or non-native looking material? <br /> Questions I through I2 must be answered prior to mobilizing a drilling rig to the site Questions 13 through 15 should be answered <br /> prior to drilling by the field staff DO NOT DRILL,if you answered NO to questions 1,2,3,4,6,7, 12, 13 or 14 or answered YES <br /> to questions 5, 8, 9, 10, 11 or 15 Contact the EMC Contractor/Consultant project manager for instructions prior to drilling and <br /> describe the conflict on the back of this form <br /> ,Reference—AntiEntroptcs,Inc in coordination with Isltional Drilling Association,Environmental Remediation Drilling Safety Guideline,Revision 0,2005 <br /> Drdimg safety_ChecklistRev F Rev 08/26/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.