My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012794
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0012794
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:15:29 PM
Creation date
2/7/2019 2:46:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012794
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DESCRIPTION OF WORK IN CALTRANS RIGHT-OF-WAY, <br /> NORTHBOUND I-5 OFF RANIP AT BENJAMIN HOLT DRIVE <br /> The San Joaquin County En%tronmental Health Department (County) requested that ARCO define <br /> the extent of hydrocarbons in the groundwater to the west and south of the ARCO site located <br /> at 2908 Benjamin Holt Drive On March 17, 1993 BC submitted a letter to Caltrans requesting <br /> permission to install one groundwater monitonng well in the Caltrans right-ot-way between the <br /> northbound I-5 oft ramp and the ARCO facility This request was verbally denied by Caltrans <br /> citing safety as the reason for denial On July 1, 1993, BC personnel requested a written denial <br /> of the access from Caltrans BC has not received a written denial ARCO installed two <br /> groundwater monitoring wells on the westernmost portion of the ARCO property in an attempt <br /> to define the lateral extent of hydrocarbons in the groundwater to the west Groundwater samples <br /> collected trom the well on the southwest portion of the site indicate that hydrocarbons are present <br /> in the groundwater to the southwest of the ARCO site beneath the Caltrans property The County <br /> has again requested that a groundwater monitorin�t, well be installed in the Caltrans right-ol-way <br /> to define the extent of hydrocarbons in the groundwater The monitoring well would be installed <br /> in the location shown on Figure 1 The monitoring well would be constructed as illustrated in <br /> Figure 2 The well installation will take approximately 8 hours and the well would be sampled <br /> on a quarterly basis Well sampling takes about one hour to complete each quarter <br /> i <br /> i - <br />
The URL can be used to link to this page
Your browser does not support the video tag.