My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projeci <br />Owner <br />BACKFILL EXCAVATION CERTIHCA fE <br />Contractor <br />Phone No. License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.,F., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12' lifts: <br />A. Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br />backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofroject completion, or submission of <br />verification that the select material descfibed above will be placed at a minimum of five (� cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />* ISM SRC -,t <br />Name int <br />Tie(Print) <br />Signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.