Laserfiche WebLink
ARCO Facility <br />jusilluela I1 ' • • • <br />M/ <br />• • 1 <br />Address 26775 S. A-Ze,s-, AU �o !*.SB'O <br />-aCy , O -X . 95376 <br />This plan is designed to meet the monitoring and response requirements of Section 2634, Article 3, <br />Title 23, CCR. <br />Secondarily contained storage tanks and lines at this facility are monitored by a continuous <br />electronic leak detection system which consists of an alarm panel, sensors and associated <br />electronics. Liquid sensors are installed in the annular space of each double wall tank and <br />product line piping sump. Whenever a sensor detects the presence of a liquid there is both a <br />visual and audible alarm at the control panel. In addition, the continuous monitor on the <br />product piping system will shut down the pump and activate the alarm system when a release <br />is detected or if the continuous product piping monitoring system fails or is disconnected, the <br />pumping system will shut down. <br />Automatic line leak detectors are installed on the secondarily contained pressurized product <br />piping. The line leak detector will detect a loss of pressure in the product lines and restrict <br />the flow of product. <br />The continuous electronic leak detection system including line leak detectors will be inspected <br />according to the manufacturer's instructions by an outside contractor once during each <br />calendar year. <br />On a daily basis the facility operator shall: <br />A. Inspect the control panel for visual and audible alarm signals to confirm that the unit <br />is operating. <br />B. Inspect island and tank fill areas for signs of spillage or petroleum sheen. <br />O Record the inspection observations on the Daily Visual Monitoring Log (Form APPC- <br />765: attached.) <br />