Laserfiche WebLink
6. <br />7. <br />Shut down the system with and location of: ARCOmatic switch, electrical panel <br />breakers, and emergency shut off switch <br />Test the electronic monitor <br />Written records of all monitoring, testing, and maintenance performed shall be maintained <br />on-site or off-site at a readily available location for a period of at least 3 years. These <br />records must be made available, upon request within 36 hours, to the local agency or the <br />Board. <br />Title <br />8. PARTY RESPONSIBLE FOR MAINTAINING EQUIPMENT <br />_— ARo-- _ -ORco F K -- <br />Name P"NE <br />