My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND RESPONSE PLAN - I <br />ARCO PRODUCTS COMPANY FACILITY WITH <br />SECONDARY CONTAINMENT OF UNDERGROUND STORAGE TANKS & <br />PRODUCT LINES <br />ARCO Facility C0 Address P,5 775 S. t'GtUri2io <br />Co qa 27L <br />This plan is designed to meet the monitoring and response requirements of Section 2634, Article 3, <br />Title 23, CCR. <br />Secondarily contained storage tanks and lines at this facility are monitored by a continuous <br />electronic leak detection system which consists of an alarm panel, sensors and associated <br />electronics. Liquid sensors are installed in the annular space of each double wall tank and <br />product line piping sump. Whenever a sensor detects the presence of a liquid there is both a <br />visual and audible alarm at the control panel. <br />Automatic line leak detectors are installed on the secondarily contained pressurized product <br />piping. The line leak detector will detect a loss of pressure in the product lines and restrict <br />the flow of product. <br />An annual tightness test will be performed on the product lines. <br />The continuous electronic leak detection system including line leak detectors will be inspected <br />according to the manufacturer's instructions by an outside contractor once during each <br />calendar year. <br />3. ROUTINE MONITORING PROCEDURE <br />On a daily basis the facility operator shall: <br />A Inspect the control panel for visual and audible alarm signals to confirm that the unit <br />is operating. <br />B. Inspect island and tank fill areas for signs of spillage or petroleum sheen. <br />a Record the inspection observations on the Daily Visual Monitoring Log (Form APPC- <br />765: attached.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.