My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Company <br />17315 Studebaker Road <br />Cerritos, California 90701-1488 <br />Telephone 213 404 5300 <br />Mailing Address: Box 6411 <br />Artesia, California 90702-6411 <br />November 6, 1991 <br />i -I r, L . <br />y_�.l.iiT -f,.I; <br />Administering Agency <br />Re: Updated Monitoring and Response Plans <br />Release Detection Methods <br />Underground Petroleum and Used Oil Storage Tanks <br />Dear Sir or Madam: <br />ARCO has revised its monitoring and response plans to <br />conform with the requirements of the August 1991 <br />revisions to the California Underground Storage Tank <br />Regulations. <br />Attached are: <br />a) A list of ARCO owned facilities located <br />in your agency's area of jurisdiction. <br />b) A summary description of the various types <br />of plans. <br />c) A summary list of each facility indicating: <br />1. Type of Equipment <br />2. Leak Detection Equipment <br />3. Appropriate Monitoring Plan <br />d) A copy of each detailed plan identified on the <br />summary in ( c) (3 ) above. <br />Site specific construction has been identified for each <br />facility in your agency's area of jurisdiction and the <br />monitoring and response plans were based on that <br />construction. <br />Please note that prior to 1/1/93, all facilities <br />currently using inventory reconciliation will be <br />reviewed to determine distance to existing or highest <br />anticipated ground water level and action will be taken <br />to provide an appropriate method of leak detection. <br />Revised monitoring and response plans will be submitted <br />as necessary to meet these new findings. <br />These monitoring and response plans are being submitted <br />for approval per CCR, Title 23, Article 4, Section 2641 <br />(g) and will assume to be approved if we have not heard <br />to the contrary by November 30. These plans will then <br />be put into effect. <br />APFIC-7076-B <br />ARCO products Company is a Division o: AtlanticR,chheldCompany (7.881 <br />
The URL can be used to link to this page
Your browser does not support the video tag.