Laserfiche WebLink
2. MAINTENANCE SCHEDULE OF MONITORING EOUIPMENT <br /> The continuous electronic leak detection system including line leak detectors will be <br /> inspected according to the manufacturer's instructions by an outside contractor once <br /> during each calendar year. <br /> 3. ROUTINE MONITORING PROCEDURE <br /> On a daily basis the facility operator shall: <br /> A. Inspect the control panel for visual and audible alarm signals to confirm that the <br /> unit is operating. <br /> B. Inspect island and tank fill areas for signs of spillage or petroleum sheen. <br /> C. Record the inspection observations on the Daily Visual Monitoring Log (Form <br /> APPC-765: attached.) <br /> 4. RESPONSE PLAN <br /> OPERATOR RESPONSIBILITIES <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an alarm is activated, station personnel are to immediately: <br /> 1. Contact ARCO Maintenance or its designated agent by using the telephone <br /> number previously provided. <br /> 2. If any visible indications of petroleum products or vapors are noticed call <br /> 911. <br /> 3. Make an entry in the Recordable Discharge Log (Form APPC-765-1: <br /> attached) indicating the action taken. <br /> 4. Complete the Recordable Discharge Log when and as the source of the <br /> alarm is known. <br /> 1ACLIENTSURCO\MASTERS\UST FormsWonitorXA.doc <br />