My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIN up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OLIANTITY i <br />Tank Diameter ` �i Product In full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br />See manual sections applicable. Check below and record procedure in log (26). F� Stage I <br />Water In tank ❑ High water table In lank excavation F] Line(s) being tested with LVLLT -Stage II <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />Bottom of tank to Grade e ....... <br />Add 3V for 4" L ................. " <br />Add 24" for Y l or air seal ....... " <br />Total tubing to assemble Approximate ........ <br />20. EXTENSION HOSE SETTING <br />Tank top to gr+de'.................................. .� n <br />Extend hose on auction tube e" or mon <br />i <br />below tank top u <br />' If Fill pipe extends above grade. use top of fill. <br />OBSERVED GRAVITY Zr <br />OBSERVED TEMPERATURES <br />CORRECTED API GRAVITY 5 r� <br />C. 0. E. <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />Is Today Warmer? I J Colder7 i i —' F Product in Tank _' F Fill -up Product on Truck _' F Expected Change I or ) <br />22. Thermal -Sensor reading after circulation / 7�f (� F <br />dprts Nearest <br />23. Digits per *F In range of expected chane—' ` <br />24. ) x <br />total quantity In coeflk lent of expansion for <br />full tank (16 or 17) Involved product <br />25. <br />volume change per 'F (24) <br />Digfts per 'F In test <br />Range(23) <br />gallons <br />volume change in this tank <br />Par -F <br />This Is <br />< Volume change per digit. lest <br />Compute to 4 decimal places. factor (a) <br />14, ARCO #6100, 25775 S. <br />paterson Pass Rd./Hwy. 5, Tracey, <br />CA <br />/U-7-0Ga <br />Nefne of Supplier, Owner or Dealer <br />Addcns No. and Streets) <br />City State <br />oue of Test <br />15. TANK TO TEST <br />16. CAPACITY <br />From <br />Stsbon Chart <br />!,- ! <br />/ <br />most accurate <br />capacity chart available r� <br />Tank Manula <br />tturer's ChartLU <br />OIdentity <br />by position <br />Nominal capacity <br />Gallons <br />Gallons <br />J Company Engineering Data <br />(� <br />la there doubt as to True Capacity? <br />J Charts supplied with R TTtr <br />rand and Gude <br />$ee Seotlon "DETERMINING TANK CAPACITY" <br />Other <br />I� <br />11. Fill UP FOR TEST <br />Stick Readings <br />to % In. <br />Total Gallons <br />Gallons ea. Reading <br />Stick water bottom <br />b S <br />before F)" <br />" _ <br />Inventory <br />to % Irl. <br />Gallons <br />FIN up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY OLIANTITY i <br />Tank Diameter ` �i Product In full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br />See manual sections applicable. Check below and record procedure in log (26). F� Stage I <br />Water In tank ❑ High water table In lank excavation F] Line(s) being tested with LVLLT -Stage II <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />Bottom of tank to Grade e ....... <br />Add 3V for 4" L ................. " <br />Add 24" for Y l or air seal ....... " <br />Total tubing to assemble Approximate ........ <br />20. EXTENSION HOSE SETTING <br />Tank top to gr+de'.................................. .� n <br />Extend hose on auction tube e" or mon <br />i <br />below tank top u <br />' If Fill pipe extends above grade. use top of fill. <br />OBSERVED GRAVITY Zr <br />OBSERVED TEMPERATURES <br />CORRECTED API GRAVITY 5 r� <br />C. 0. E. <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />Is Today Warmer? I J Colder7 i i —' F Product in Tank _' F Fill -up Product on Truck _' F Expected Change I or ) <br />22. Thermal -Sensor reading after circulation / 7�f (� F <br />dprts Nearest <br />23. Digits per *F In range of expected chane—' ` <br />24. ) x <br />total quantity In coeflk lent of expansion for <br />full tank (16 or 17) Involved product <br />25. <br />volume change per 'F (24) <br />Digfts per 'F In test <br />Range(23) <br />gallons <br />volume change in this tank <br />Par -F <br />This Is <br />< Volume change per digit. lest <br />Compute to 4 decimal places. factor (a) <br />
The URL can be used to link to this page
Your browser does not support the video tag.