My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. /� Piping (cross-sectional gram, including connections to tank and dis, ers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank (Section 2635 (b) (2) (8) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br /> (e) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (0) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normalration conditions shall be: <br /> installed inside a secondary containment system in the form of: secondary pipe_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak detectors will be installed on pressurized piping <br /> Manufacturer: Model: <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. /1 State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water. L\N\SN J1A�l� <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> 23. Total number of tanks on site after installation: - E XL,a –T,o <br /> 24. County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-END Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Name.—\ l�`� A A � Title,,- i 7UR �)\A�)l-R Date <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.