My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1986 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:00:44 PM
Creation date
2/7/2019 2:53:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SEA(ICES �qvzv <br />SAN JOAQUIN COUNTY i+ <br />ENVIRONMENTAL HEALTH DIVISION <br />Karen Furst, M.D., M.P.H., Health Officer r•.. <br />304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br />209/468-3420 <br />APPLICATION FOR PERMIT TO CLOSE <br />UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br />GENERAL INSTRUCTIONS: <br />Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to <br />the applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfrelds, water wells, <br />buildings, underground public utility lines (including water, sanitary sewer and storm sewer), and distance <br />of piping from tank to dispensers. If underground utilities are not included on the site map, you must state <br />in writing that USA Dig will be contacted prior to excavation activities. <br />[ ] 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". of : Sampling firm <br />shall be an independent third party from the contractor. <br />[ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br />OWNERIOPERATOR of the facility. <br />[ ] 5. Submit the appropriate fees and complete page 11, the "Underground Storage Tank Program Fee <br />Worksheet". <br />[ ] 6. Complete all questions on page 10, the Public Health Services -Environmental Health Division (PHS-EHD) <br />"Underground Storage Tank Disposition Tracking Record", except those requiring a signature and date <br />of tank removal. The holder of the permit shall be responsible for ensuring that this form is completed and <br />returned to PHS-EHD within 30 days of the tank removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards <br />for this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ J 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by <br />the County of San Joaquin Building Department and the incorporated City Building Departments, pursuant <br />to the Uniform Building Code STD 70-11. <br />J 9. Obtain a "Grading and Excavation Permit" from the City of Tracy Building Division prior to PHS-EHD <br />approval of the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br />plan. If gross deficiencies are identified, an addendum will be required with a $89.00/hour fee and the <br />review will begin on the date of resubmittal. <br />[ ] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />[] 12. Advance inspection notice of at least 48 hours is required by PIIS-EHD. <br />j 13. Submit Contingency Plan for over -excavation at time of UST removal (if planning to over -excavate). <br />See "III. SITE MITIGATION' on Page 2. <br />EH 23 046 (Revised 8/l/01) Page 1 <br />A Division of San Joaquin County I Iealih Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.