Laserfiche WebLink
Artesian Environmental Consultants, Inc. <br /> Standard Operating Procedures <br /> GROUNDWATER MONITOR / EXTRACTION WELL INSTALLATION <br /> .. AND DEVELOPMENT <br /> WELL INSTALLATION <br /> The boreholes for monitor/extraction wells are drilled using a truck-mounted hollow-stern <br /> auger drill rig. The diameter of the borehole is a minimum of four inches larger than the <br /> outside diameter of the casing when installing the well screen (DWR Publication 74-81). <br /> The hollow-stem auger provides minimal interuption of drilling while penrritting soil <br /> sampling at the desired intervals. All wells are installed by state-licensed drillers. <br /> The mo.-titor/extraction wells are cased with threaded, factory-slotted, blank schedule 40 <br /> polyvinyl chhloride (PVC). The perforated interval consists of slotted casing, generally <br /> 0.020-in',h wide by I.5-inch Iong slot size, with 42 slots per foot. A threaded PVC cap is <br /> fastened to.the bottom of the casing. Centering devices may be fastened to the casing to <br /> assure even distribution of filter material and grout within the borehole annulus. The well <br /> casing is thoroughly washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem, sand or gravel filter material is poured into <br /> the annular space to fill from the bottom of the boring to I foot above the slotted interval. A <br /> I to 2 foot thick bentonite plug is placed above the filter material to prevent the grout from <br /> infiltrating down into the filter material. Neat cement,containing about 5% bentonite, is then <br /> tremied into the annular space from the top of the bentonite plug to the surface. A lockable <br /> PVC cap is placed on each wellhead. Traffic-rated flush-mounted steel covers are installed <br /> around wellheads for wells in parking lots and driveways, while steel stove pipes are usually <br /> set over wellheads in landscaped areas. <br /> � . WELL DEVELOPMENT <br /> After installation, the wells are thoroughly developed to remove residual drilling materials <br /> from the wellbore, and to improve well performance by removing any fine material in the <br /> filter pack that can pass from the formation into the well. Well development is performed in <br /> s accordance with California Regional Water Quality Control Board (RWQCB)procedures <br /> described in the Leaking Underground Fuel Tank(LUFT)Field Manual, the Tri-Regional <br /> Board Staff Recommendations for Preliminary Evahration and hivestigation of Underground <br /> Tank Sites ,and local regulatory guidelines. Well development techniques include pumping, <br /> bailing, surging, swabbing,jetting,flushing, and airlifting. During well development from <br /> three to ten well volumes are evacuated from the well,allowing pH, specific conductivity, <br /> temperature and sediment content of the water to stabilize. Ali development water and <br /> rinseate is collected for temporary storage in labeled 55-gallon containers or proper storage <br /> tanks,and is then disposed of properly depending on analytical results. To assure that <br /> cross-contamination does not occur between wells during drilling and development,all <br /> development equipment is either steam cleaned or cleaned using Alconox and rinsed twice <br /> with dionized water. <br /> t� <br /> 6w <br />