My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000629
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS XR0000629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 5:17:39 PM
Creation date
2/7/2019 3:33:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000629
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> "1 <br /> �3 <br />„a SECTION 3 <br /> SITE INVESTIGATION <br /> J <br /> i <br /> 1. <br /> ;r <br /> SOM BORING AND SOIL SAMPLING PROCEDURES <br /> ` Three (3) soil borings were installed using 10-inch hollow-stem augers. Boring <br /> locations were described in Section 2 and are shown in Figure 4. Soil borings were <br /> designated as SB-01, SB-02, and SB-03, which correspond to monitoring wells MW-1, <br /> -;. MW-2 and MW-3, respectively. The total depth of each boring was 25 feet below <br /> ' <br /> ' ground surface (bgs). Total depth was selected based on encountering <br /> a groundwater at <br /> r approximately 15 feet bgs in each well, which allowed construction of monitoring wells <br /> with 10 feet of screened interval below and 5 feet of screened interval above the water <br /> x table. ` <br /> During soil-boring operations, soil samples were collected at least every five feet in <br /> ifi <br /> the unsaturated zone with a split-spoon sampler. Representative portions of the soil <br /> samples were split for head space OVA screening, iithologic description, and laboratory <br /> e analysis. Soil sa!males were collected in brass tubes within the split-spoon sampler. The <br /> ends of each tube were covr�ed with Teflon tape and then capped with plastic caps. The <br /> caps were sealed will: duct tape, at the recommendation of the Public Health Services <br /> r representative. <br /> During soil-boring operations, geological descriptions of the soil were made by an on- <br /> site geologist, and soil-baring logs were constructed. These soil-boring Iogs (with <br /> s monitoring well consuruction data)are displayed in Appendix B. <br /> The most contaminated soil sample above the water table from each boring was <br /> submitted for laboratory analysis. 1`hP most contaminated sample was determined by <br /> field OVA analysis. For each sampling point, soil was preserved in glass jars filled <br /> approximately 1/2 full, and the jar —nouth covered with aluminum foil and then capped. <br /> 3-1 <br /> a' 175-0/15 4/24193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.