My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000721
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS XR0000721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:37:25 PM
Creation date
2/7/2019 3:42:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000721
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST ON SITE ENV5PCI� �ITA H LTH <br /> MIT SERE <br /> S III PETROLEUM SITE HEALTH AND Tj' P <br /> CLAS AUL NPH Zt <br /> Prior to initiating field activities the Site Safety Officer (SSO) must review the Site Health and Safety Plan <br /> (SHSP) with all members of the field crew, including Delta employees and subcontractors. All field team <br /> members shall have completed OSHA 40-hour HAZWOPER training (29 CFR 1910.120), CPR and Fust <br /> Aid training. When required by the local regulatory authority, copies of training certificates, CPR/first aid <br /> cards, and respirator fit-test documentation shall be maintained on-site. Each team member must review <br /> the SHSP and sign and date the Acknowledgement Agreement on page 14 of the plan. The signed plan is <br /> to be kept in the field for the duration of the project and returned to the project file upon completion of <br /> field activities. <br /> SHSP's may be revised,or rewritten for different phases of a project,if site activities are distinctly different, <br /> if areas of differing hazard are involved, or as informatioa about contaminants and hazards changes. <br /> Changing conditions may justify either increasing or decreasing SHSP restrictions and action levels, <br /> depending upon the additional information generated. <br /> DELTA PROJECT NUMBER_4� 61 O <br /> L GENERAL INFORMATION <br /> pp r <br /> Client:_ o- C rp e Ky C�.S. _ Site Owner. <br /> Site Name:Lor1L,4J 64(xo4, �}� �0 Client Claim/P.O. Number: <br /> Site Address:31 -8 We C+ yek -&%V% In"J+ 61 s ec�-�� , CA <br /> Project Manager-. <br /> Plan Prepared by: K t,L ��kw�{� _ Date: 3 ZS 3 <br /> Approved by: � � Date: <br /> Revised by: Date: <br /> Revision Approved by: Date: <br /> Proposed Date of Investigation: 4 3 <br /> Obiectives: Investigate the extent of on-site soil and ground water contaminants and take necessary cleanup <br /> action. <br /> Phase I - Soil borings and monitoring wells. Samples collected for laboratory analysis will use <br /> EPA Method 8015 for Total Petroleum Hydrocarbons (TPH) and EPA Method 602 or 8020 for <br /> benzene, toluene, ethylene and xylene(BTEX). Check with local and state agencies for additional <br /> requirements. <br /> Phase II - Soil excavation as needed. <br /> Phase III - Site cleanup to include, as needed, recovery well, treatment systems construction and <br /> maintenance. <br /> SHSP-92-JUEMO <br /> PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.