My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
17103
>
2900 - Site Mitigation Program
>
PR0524391
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 5:22:44 PM
Creation date
2/7/2019 3:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0524391
PE
2965
FACILITY_ID
FA0016362
FACILITY_NAME
MOUNTAIN HOUSE WWTP
STREET_NUMBER
17103
Direction
W
STREET_NAME
BETHANY
City
TRACY
Zip
953917301
CURRENT_STATUS
01
SITE_LOCATION
17103 W BETHANY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG. 22. 200-5 :Il,Fly NO. 2845 P. 1 <br /> CONDOR EARTH TECHNOLOGIES INC <br /> 1 188 Frank West Circle Suite I <br /> Stockton CA 95206 <br /> Phone 209.234.0518 <br /> wuFAX 209234.0538 <br /> CONDOR w .rondorea th.com <br /> FAX COVER SHEET <br /> TO: Mike Infurna <br /> DATE: 8-22-05 <br /> PHONE: 209-468-3454 <br /> FAX: 209-468-3433 <br /> CC: <br /> FROM; Kevin Freitas <br /> JOB#: 1587X6 <br /> SUBJECT: Mountain House Monitoring Well Insulation <br /> This facsimile transmission is intended only for the addressoc above. It may contain information that is privileged,confidential,or <br /> otherwise protected from disclostrce. Any review,dissetmnanon,or use of this transmission.or its contents by persons other than <br /> the addressee is strictly prohibited. If you have received this dupumission in error,please norify us intmedimely by relephone. <br /> Mike, <br /> The Well's were installed as follows <br /> Wells 16D, 17D, and 18D: Screen Interval 25 15 , Sand Interval 25'-14', Bentonite Interval <br /> 14'-121, Grout 12'- to the ground surface, 8-inch diameter borehole, Materials = 10' of 0.020 <br /> Schedule 40 2" Screen, 18' of(Plus 3' stick-up) 2" Schedule 40 blank casing, 3 t/a Bags of#3 <br /> Monterey Sand, I bag of r/Z inch bentonite pellets, 2-100 pound bags of neat cement mixed with <br /> water. <br /> Wells 165, 175, and 18D: Screen Interval 12'-7', Sand Interval 12'-6', Bentonite Interval 6'-4', <br /> Grout 4'- to the ground surface, 8-inch diameter borehole, Materials = 5' of 0.020 Schedule 40 <br /> 2" Screen, 15' of(Plus 3' stick-up) 2" Schedule 40 blank casing, 2 Bags of#3 Monterey Sand, 1 <br /> bag of t/z inch bentonite pellets, 1-100 pound bags of neat cement mixed with water (with some <br /> left over). <br /> All wells were completed with stovepipe monuments. <br /> Let me know if you need anything else. <br /> Total number of pages(including this cover sheet) 1 <br /> If you do not receive all of these pages,please call. <br /> p,\Mol Howe\1587[587 X\1587X6 Ow MOA�ronq`yC0R\Faxes\Mike lnfhms MZ.OSAW <br />
The URL can be used to link to this page
Your browser does not support the video tag.