My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
WORK PLANS 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 9:14:46 AM
Creation date
2/7/2019 5:02:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G Water Quality Information: <br /> i) Tables of water quality data for each monitor well within the area of the <br /> testing. Wells segregated into monitor zones, and upgradient, <br /> downgradient and within the plume wells. The data should include <br /> detection and reporting levels for the analyses listed. <br /> ii) Water quality data should include VOCs, general minerals, metals <br /> (need to include iron, manganese, total chromium, hexavalent <br /> chromium, . . .), sulfate, nitrate, ammonia, dissolved oxygen, <br /> oxidation/reduction potential, chemical oxygen demand, total dissolved <br /> solids, electrical conductivity, temperature <br /> iii) Figures depicting the groundwater contaminant plume configurations <br /> for each of the monitor zones. <br /> iv) Tables presenting background concentrations of CDCs, injectant <br /> components and potential breakdown products. <br /> H Project Proposal: <br /> i) Proposed injection points <br /> ii) Injectant(s) to be used for remediation and for biofouling control <br /> iii) Analysis of the injectants —VOCs, semi-VOCs, metals, general <br /> minerals, pH, TDS. . . <br /> iv) Potential breakdown products of COCs and injectants. Estimated <br /> concentrations of the injectants and breakdown products remaining at <br /> the conclusion of the project. The estimated concentrations need to be <br /> compared to background concentrations of the pollutants. <br /> v) Proposed injectant rates and concentrations. <br /> vi) Proposed tracer compounds, application concentration rates, and <br /> concentrations of tracer within treatment zone for conducting tracer <br /> tests <br /> vii) Delineation of treatment zone — including figure <br /> viii)Delineation of transition zone — including figure <br /> ix) Proposed monitoring program —frequency, methods, quantitation and <br /> detection limits — use Attachment C as template. <br /> x) Treatment system, if any, description and proposed operation <br /> xi) List of proposed wells, and figure delineating the locations of the wells, <br /> for monitoring upgradient and downgradient groundwater quality and <br /> groundwater elevations. Wells should be designated for the treatment <br /> zone, transition area within treatment zone and compliance wells at the <br /> treatment zone downgradient boundary. <br /> xii) Contingency Plan — Plan for corrective actions if violations are found at <br /> the points of compliance. <br /> I List of Interested Parties <br /> J Draft Fact Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.