Laserfiche WebLink
G Water Quality Information: <br /> i) Tables of water quality data for each monitor well within the area of the <br /> testing. Wells segregated into monitor zones, and upgradient, <br /> downgradient and within the plume wells. The data should include <br /> detection and reporting levels for the analyses listed. <br /> ii) Water quality data should include VOCs, general minerals, metals <br /> (need to include iron, manganese, total chromium, hexavalent <br /> chromium, . . .), sulfate, nitrate, ammonia, dissolved oxygen, <br /> oxidation/reduction potential, chemical oxygen demand, total dissolved <br /> solids, electrical conductivity, temperature <br /> iii) Figures depicting the groundwater contaminant plume configurations <br /> for each of the monitor zones. <br /> iv) Tables presenting background concentrations of CDCs, injectant <br /> components and potential breakdown products. <br /> H Project Proposal: <br /> i) Proposed injection points <br /> ii) Injectant(s) to be used for remediation and for biofouling control <br /> iii) Analysis of the injectants —VOCs, semi-VOCs, metals, general <br /> minerals, pH, TDS. . . <br /> iv) Potential breakdown products of COCs and injectants. Estimated <br /> concentrations of the injectants and breakdown products remaining at <br /> the conclusion of the project. The estimated concentrations need to be <br /> compared to background concentrations of the pollutants. <br /> v) Proposed injectant rates and concentrations. <br /> vi) Proposed tracer compounds, application concentration rates, and <br /> concentrations of tracer within treatment zone for conducting tracer <br /> tests <br /> vii) Delineation of treatment zone — including figure <br /> viii)Delineation of transition zone — including figure <br /> ix) Proposed monitoring program —frequency, methods, quantitation and <br /> detection limits — use Attachment C as template. <br /> x) Treatment system, if any, description and proposed operation <br /> xi) List of proposed wells, and figure delineating the locations of the wells, <br /> for monitoring upgradient and downgradient groundwater quality and <br /> groundwater elevations. Wells should be designated for the treatment <br /> zone, transition area within treatment zone and compliance wells at the <br /> treatment zone downgradient boundary. <br /> xii) Contingency Plan — Plan for corrective actions if violations are found at <br /> the points of compliance. <br /> I List of Interested Parties <br /> J Draft Fact Sheet <br />