My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
WORK PLANS 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 9:14:46 AM
Creation date
2/7/2019 5:02:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vow <br /> MONITORING AND REPORTING PROGRAM ORDER NO. R5-200X-XXXX 3 <br /> DISCHARGER NAME <br /> COUNTY <br /> 3 Metals include barium cadmium, calcium,total chromium,copper, lead, magnesium, <br /> manganese, mercury,molybdenum, nickel and silica. <br /> FIELD SAMPLING <br /> In addition to the above sampling and analysis, field sampling and analysis shall be conducted each time <br /> a monitor well or extraction well is sampled. The sampling and analysis of field parameters shall be as <br /> specified in Table 3. <br /> Table 3: Field Sampling Requirements <br /> Parameters Units Type of Sample <br /> Groundwater Elevation Feet, Mean Sea Level Measurement <br /> Oxidation-Reduction Potential Millivolts Grab <br /> Electrical Conductivity uhmos/cm Grab <br /> Dissolved Oxygen m /L Grab <br /> H pH Units to 0.1 units Grab <br /> Field test instruments (such as those used to test pH and dissolved oxygen)may be used provided that: <br /> 1. The operator is trained in proper use and maintenance of the instruments; <br /> 2. The instruments are calibrated prior to each monitoring event; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; <br /> and <br /> 4. Field calibration reports are submitted as described in item(b) of the "Reporting" section of this <br /> MRP. <br /> DISCHARGE MONITORING <br /> The Discharger shall monitor daily the discharge of water and amendments that are injected into the <br /> groundwater according to the requirements specified in Table 4. Each amendment addition shall be <br /> recorded individually, along with information regarding the time period over which the amendment was <br /> injected into the aquifer. <br /> Table 4: Discharge Monitoring Requirements <br /> Parameters Units Type of Sample <br /> Injected Volume gallons per day Meter <br /> Amendments Added kilograms per day Measured <br /> Biocide Added kilograms per day Measured <br />
The URL can be used to link to this page
Your browser does not support the video tag.