My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
WORK PLANS 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 9:14:46 AM
Creation date
2/7/2019 5:02:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION SHEET OF..-cR NO. R5-2008-0149 — 8 <br /> IN-SITU GROUNDWATER REMEDIATION AT SITES WITH VOLATILE ORGANIC <br /> COMPOUNDS, NITROGEN COMPOUNDS, PERCHLORATE, PESTICIDES, <br /> SEMI-VOLATILE COMPOUNDS AND/OR PETROLEUM HYDROCARBONS <br /> from aquifer materials by the reduction process, be released from amendments <br /> during reactions, or change to more toxic states during the oxidation process. <br /> These waste discharge requirements allow a slight increase (20% over <br /> background) in metals and salts, as long as water quality objectives are met. A <br /> value of less than 20% would be within the error of duplicate analysis <br /> comparability criteria and an exceedance not always verifiable. Water quality <br /> objectives for the anticipated pollutants that are found at these remediation <br /> projects are established in the Findings. The water quality objectives are <br /> established based on the numerical and narrative standards found in the Basin <br /> Plan. <br /> Coverage Under the Order <br /> To obtain coverage under the order, the project proponent must submit a Notice <br /> of Intent (NOI) and supplemental information listed in Attachment A. The <br /> information requirements are significant as these projects are complex and <br /> require a great deal of knowledge about the project site and remediation <br /> processes. Though the requirement for submittal of information is substantial, it <br /> should be information that has already been developed by the project in order to <br /> justify the remediation project to the appropriate regulatory agency. <br /> In order for coverage to occur, the project proponent needs to demonstrate <br /> through laboratory-scale tests that the proposed project will adequately promote <br /> remediation of the pollution. The laboratory-scale tests will also be used to <br /> identify potential adverse water quality impacts with the project and help <br /> establish monitoring parameters. If there are data from projects sufficiently <br /> similar to the proposed project, the proponent can use that information in lieu <br /> performing the laboratory-scale testing, as appropriate. Once the project is <br /> completed, the project proponent will file for termination of coverage under the <br /> general order. <br /> AMM\AST\MLP <br />
The URL can be used to link to this page
Your browser does not support the video tag.