Laserfiche WebLink
02 December 2009 <br /> AGE-NC Project No. 96-0106 <br /> Page 6 of 10 <br /> for a period of o�np month following completion of the last ISCO application. The proposed wells <br /> will be monitoriand sampled for the parameters and constituents listed in section 3.4.The purpose <br /> of the sampling events is to monitor the progress of the application and to evaluate if secondary <br /> metals are being mobilized due to oxidant treatment. <br /> 3.7. REPORT PREPARATION <br /> Following the conclusion of the ISCO pilot test, a report will be prepared documenting the well <br /> installation, documenting the ISCO injections and presenting the findings. The report will include <br /> a description of work performed and the results of the soil—aniffYor groundwater sampling and NJ <br /> analysis; conclusions and recommendations will also be included, if applicable. The report will be <br /> in a format acceptable to the EHD, and will be reviewed and signed by a California Professional <br /> Geologist. <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative and under the supervision of a <br /> California Registered Professional Geologist.Procedures for the installation of one monitoring well, <br /> collection of background/baseline sampling, injection of the RegenOxTM media, weekly ground <br /> water monitoring and sampling, and equipment decontamination are outlined below. <br /> 4.1 PRELIMINARY AQUIFER VOLUME TESTING <br /> Prior to ISCO pilot test injection, a clear water injection will be performed at the site utilizing well �wk, <br /> MW-3. The stratigraphy encountered at well MW-3 represents the general site stratigraphy and the <br /> dissolved plume does not extend east to well MW-3, therefore, this well location is suitable for 11�)ON4 <br /> liquid injection evaluations. Based on manufacturer recommendations for the lower sand interval � <br /> (Appendix H),AGE proposes to inject 365 gallons of clear potable water(1.25 times the proposed u)a'yS k' <br /> volume ofwater combined with RegenOx for a single boring location:approximately 1,450 gallons/5 Iv&;l R 9 <br /> locations x 1.25=365 gallons)which will be procured from the site.Prior to the injection the water <br /> will be sampled and analyzed for TPH-g,BTEX,fuel oxygenates,and lead scavengers to ensure that <br /> the clear water is pollutant free. <br /> Once it is determined that the clear water is pollutant free 365 gallons of water will be placed in an <br /> pre-fabricated water trailer.The water will be metered from the proposed source into the water tank <br /> utilizing a Sensus flow meter. Once the appropriate volume of water has been metered into to the <br /> holding tank the well will be fitted with a pressure cap that has been retrofitted with a hose.The hose <br /> Advanced GeoEnvironmental,Inc. <br />