Laserfiche WebLink
1' <br />' Weldon Church Site Background Information <br /> Page 3 of 4 <br />' SITE <br /> ASSESSMENT ACTIVITIES <br />' Six soil probe borings were advanced at the site on 20 December 1996. Soil and water samples were <br /> collected at discrete depth intervals from the majority of the probe borings. Figure 2 depicts the <br />' locations of the probe borings. <br /> TPH-g was detected in three of the soil samples analyzed at concentrations as high as 2,800 mg/kg <br />' (P3-6). BTEX compounds were detected in the same three samples at concentrations as high as <br /> 93 mg/kg(total xylene,P 1-6).The maximum benzene concentration detected was 2.8 mg/kg(P 1-6). <br />' TPH-g was detected in grab water samples at concentrations as high as 210,000 mg/I. BTEX <br /> compounds were also detected in four of five grab ground water samples at concentrations as high <br /> as 35,000 mg/1 (toluene P6). The maximum benzene concentration detected was 12,000 mg/1 (P6). <br />' The installation of the soil probe borings was summarized in the PIER prepared by AGE, dated <br /> 10 September 1996. <br /> IBetween July 1996 and April 1998, a total of six wells were installed on the site and surrounding <br /> properties in order to determine the lateral and vertical limits of the dissolved hydrocarbon plume. <br /> In July 1996, four soil borings were drilled and completed as 2-inch diameter ground water <br /> lie <br /> monitoring wells with slotted screens from approximately 5 to 25 feet bsg. <br /> rIn April 1997,soil borings B5 (MW-5)and B6 (MW-6)were drilled and completed as ground water <br /> monitoring wells. Monitoring well MW-5 was completed using a 2-inch diameter PVC casing with <br /> a slotted screen from approximately 3 to 10 feet bsg. Ground water monitoring well MW-6 was dual- <br /> completed with screen intervals installed from a depth of 20 to 23 feet bsg and 3 to 13 feet bsg. The <br /> installation of the first four monitoring wells was summarized in the PIER prepared by AGE, dated <br /> 10 September 1996. <br /> On 07 May 1998, soil borings B 13, B14, and B 15 were advanced manually and one boring was <br /> completed as a ground water monitoring well.Borings B 13,B 14(MW-7),and B 15 were established <br /> on the property at 52 West Beverly Place. The installation of the borings was performed using a <br /> six-inch diameter hand auger. <br /> On 09 and 10 June and 26 August 2003, nine soil probe borings (B 16 through B24) were advanced <br /> on- and off-site. <br /> ISeventeen soil samples were analyzed; TPH-g and various BTEX compounds were detected in <br /> samples B17-5, B18-10, and B20-8 at maximum concentrations of 15 (mg/kg) TPH-g (B20-8), <br /> 0.52 mg/kg benzene(BIS-10), 0.18 mg/kgtoluene (B17-5), 0.24 mg/kg ethylbenzene (B17-5), and <br /> 2.15 mg/kg xylenes(B 17-5);xylenes were also detected in sample B 16-5.5 at 0.006 mg/kg. The fuel <br /> IAdvanced GeoEnvironmental,[nc. <br />