Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME t'k2 L� # ► © � DATE Co I S I o 2 <br /> FACILITY ADDRESS 2 S 1 S S P T T C-y2-S o1--J io S S S t A r y , C <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> (7 l X14 PA t L p i>e,-2-A-'r'orz, ( r R-la,rv-c t— s`E <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS N �0'-1 S PIPING cn rv--,r- / o S <br /> 3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br /> S 1 P I rV(� U M P N l'r JIL_ [N pJ r4t D LE <br /> S�+S WL.S L o c.✓h r'�'D civ �}+v w -h n�nr ,. �Iq�(. S� �C_C P S r neo <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panely C--C-�:)cn YZO o -- Tt, S- 3 <br /> Name and Model of Line Leak Detectors V c Ll-r- T ",L-- <br /> Name <br /> ,L-Name and Model of Annular Sensors v ce 20 o T 7 9 1 3 9 0 - L-' 09 <br /> Name and Model of Piping Sensors o -- Z-C:'Sr <br /> Name and Model of Dispenser Sensors 0 - Zo <br /> Type of overfill prevention pe <br /> S.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes 0 No 0 <br /> Does the turbine shut down if a sensor is disconnected? Yes 4 No❑ <br /> Does the turbine shut down is the monitoring panel loses power? Yes 9 No 0 <br /> 6. How will the alarm history and subsequent maintenance be recorded? <br /> D A 4-1- e--Z-M L'0C' <br /> 4 y P Ytit e ^�T r2 •4.2 L o G /{1.t. u L ca f 6 D r*., o iLsk*"G 4e p <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment. What month will <br /> annual monitoring certification be performed in? -rM�rT- <br /> pC 2 FbvZ FD 8 4 S C.©r r cum n p ra rV-1 t r., w. res a.C H <br /> Note.•For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8. Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment. rA�,ml i e- <br /> I:\mstemi-le\USTl monitoringplan.doc <br /> 1/24/2002 <br /> SA tJ J15A e r�rr-,3 <br />