My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1989 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1989 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:12:34 PM
Creation date
2/8/2019 9:46:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4 <br /> SV,rRCB,January 2002 Page A of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: N Tank Manufacturer D Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 4 Vacuum 0 Hydrostatic <br /> El Other <br /> Test Equipment Used: Equipment Resolution: <br /> Tank# go Tank 9 Tank#3 — 9 Tank# <br /> Is Tank Exempt From Testing?' 0 Yes ONo a Yes DNo K Yes',, 0 No a Yes LJ No <br /> Tank Capacity: <br /> Tank Material: D6L FigelzLLASS Dgi— Fi 6L F1 cy-Ll Ajr� f)9L <br /> Tank Manufacturer- E75 xX <br /> Product Stored- �-7 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: AS, ►til I M t Oj <br /> Test Start Time: ac� 00 12 <br /> Initial Reading(Rj: 10f. Z 0 04 /1 H4 <br /> Test End Time: 36 <br /> OL <br /> Final Reading(RF): <br /> li?" 4, 14 te O"-soo 144 <br /> Test Duration: Al-0 4 e .�? aHywje <br /> Change in Reading(RF-Rj): N — t ,541 t44 <br /> H4 04 H4 <br /> Pass/Fall Threshold or Criteria: H4 ± 'Z// 146 1-1 <br /> Fail PFail <br /> FNo' 0 NA <br /> - <br /> Was sensor removed for testing? Dyes 0 Yes N No 0 NA L)Yes ®No 0 NA 0 Yes &No DNA <br /> Was sensor properly replaced and 0 Yes '--0 No <P-NA <br /> verified functional after testing? _❑,Ycs ONo 9111A 1 0 Yes 0 No 16 NAT El Yes 0 No 9 NA <br /> Comments—(include information ohfeEairs made prior to testing,and recommended follow-up for failed tests) <br /> Seenridary enntAinment.gy.-te-mv where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)} <br />
The URL can be used to link to this page
Your browser does not support the video tag.