My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
916
>
3500 - Local Oversight Program
>
PR0544125
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:28:21 PM
Creation date
2/8/2019 4:11:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544125
PE
3528
FACILITY_ID
FA0003770
FACILITY_NAME
SHAWVER, WILLIAM L JR, TR ETAL
STREET_NUMBER
916
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14324007
CURRENT_STATUS
02
SITE_LOCATION
916 N BROADWAY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Yater Resources CoritrBoard <br /> it .1�#��, ,�r <br /> Division of Clean Water Pra rams �, ya ;-'x.. , yy , .o... <br /> 2014"r Street•Sacramento,California 95814•(916)227-441 `-lt` <br /> Winston H. Hickox f t <br /> Mailing Address: P.Q.Box 944212 Sacramento,California•94244,2120 Gra Davis <br /> Secretary for �-� Y <br /> FAX(916)227-4530•[nternet Address: http:Ylwwwswrcb.ca:gov/ ch�tn / tcC Governor <br /> i Environmental r 12: . <br /> Protection <br /> i NOV ] 6 1999 <br /> d <br /> William Shawver " <br /> I Shawver Trucking Company,Inc. <br /> 916 Broadway N <br /> Stockton, CA 95205 <br /> I� UNDERGROUND STORAGE TANK CLEANUP FUND PROGRAM,NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 014797; FOR SITE ADDRESS: 916 BROADWAY N, <br /> Your claim has been accepted for placement on the Priority List in Priority Class "B" with a deductible <br /> I` of$5,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance_Review: Staff reviews,verifies, and processes claims]used on the priority and rank within <br /> a priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance— <br /> Review <br /> ompliance—Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued o'.)Iigating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup, you have'' <br /> not supplied necessary information <br /> or documentation, or your claim application contains a material error;the claim will be rejected. In such <br /> event,you will be issued a Notice of Intended Removal from the Priority List, informed of the basis'for <br /> the proposed removal of your claim, and provided an opportunity to correct:the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or intentional or negligent misrepresentation. <br /> Record keeping_ During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will be required to submit: (1) copies of detailed invoices for all,corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3)copies of technical documents (bids,narrative work description,reports), and(4)evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> C Fund.. It is not necessary to submit these documents at this time;however;!they.will definitely be <br /> required prior to reimbursement. <br /> 7 <br /> Compliance with Corrective Action Requirements: In order to be teimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16,Division 3, Title 23,California Code of Regulations. Article I 1 categorized the <br /> corrective action process into phases. In addition,Article 11 requires the responsible party to submit an <br /> California Eu viroBmentaiProtection Agency <br /> �Ci' Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.