Laserfiche WebLink
UST Operating Permit Application-Tank Information Instructions <br /> (Formerly SWRCB Permit Application Form B and UPCF Foran hwfwrc-b) <br /> Complete a separate form for each UST for days of <br /> all new permits,permit changes,and any UST system information changes. This form must be sub 9Antalized unit <br /> P <br /> pen-nit or UST system information changes,unless your local agency requires approval prior to making changes.For tanks that are pa o or Val,Con,nll lg only <br /> each compartment is considered a separate tank and requires completion of a separate Tank Information form.For a UST permanent cc�� �`ll�`�_ <br /> TYPE OF ACTION and Sections i,i1,ill,IV,and iX.(Note: Numbering of these instructions matches the data element numbers Ila ®v �.a,� <br /> 430. TYPE OF ACTION-Check the appropriate box to indicate why this form is being submitted. as removed on \' <br /> 430a. DATE UST PERMANENTLY CLOSED-For OV RED-Enter the datethis sUST was discoveure only: red.Leave blank f installation date the USTwrdate isknoswn. �G� <br /> 430b. DATE EXISTING UST DiSC ® P� <br /> I. FACILITY iD NUMBER-This space is for agency use only. <br /> 3. BUSINESS NAME-Enter the complete facility name. cal location of <br /> 103. BUSINESS SITE ADDRESS-Enter the street address of the facility,including building number,if applicable. This address must e <br /> the facility.Post office box numbers are not acceptable. <br /> 104. CITY-Enter the city or unincorporated area in which the facility is located. <br /> 432. TANK ID#-Applicant may enter the owner's tank identification number or leave this space bink.The Local Agency will assign the State tank identification <br /> number as the unique identifier for the tank. <br /> 433. TANK MANUFACTURER-Enter the name of the company that manufactured the tank. <br /> 434. TANK CONFIGURATION.Check the appropriate box to indicate if the tank is a stand-alone tank or one in a compartmented unit,A separate UST Operating <br /> Permit Application-Tank Information form must be submitted for each compartment. <br /> 435. DATE UST SYSTEM INSTALLED-Enter the date the local agency signed-off on installation of the UST system. This is the date of initial tank system <br /> installation,and does not include upgrades or retrofits which may have been performed later.if this is for a new installation,leave blank. <br /> 436. TANK CAPACITY 1N GALLONS:Enter the tank capacity. For compartmentalized tanks,enter data for the compartment covered by this tank form only. <br /> 437. NUMBER OF COMPARTMENTS IN THE UNIT:If the tank is a compartment,enter the total number of compartments in the unit. <br /> 439. TANK USE-Check the type of tank usage. <br /> 439a. If you checked"Other"specify the type of tank usage in the space provided. <br /> 440. TANK CONTENTS-Check the specific petroleum or non-petroleurn substance stored_ <br /> 440a. if you checked"Other.Petroleum"specify-the common name of the substance in the space provided[i.e.,the name used in the facility's Hazardous Materials <br /> Business Plan(HMBP)inventory]. <br /> 440b. 1f you checked"Other"under Non-petroleum,specify the common name of substance in the space provided(i.e.,the name used in the HMBP inventory). <br /> 443. TYPE OF TANK-Check the box that identifies the type of tank. <br /> 444. TANK PRIMARY CONTAINMENT-Check the construction material of the primary containment(i.e., inner tank wall nearest the hazardous substance <br /> stored). If the tank material is not listed,check"Other"and specify the material in the space provided. <br /> 444a. if you checked"Other"specify the type of primary containment in the space provided. <br /> 445. TANK SECONDARY CONTAINMENT-Check the construction material of the secondary containment that provides containment external to,and separate <br /> from,the primary containment described above. If the tank is a single-wall tank,check"None." if the material is not listed,check"Other" and specify the <br /> material in the space provided(e.g..HDPE). <br /> 445a. if you checked"Other"specify the type of secondary containment in the space provided. <br /> 452 OVERFILL PREVENTION-Check the box(es)to describe the type(s)of overfill protection equipment installed. <br /> 458. PIPING SYSTEM TYPE-Check the type of product/waste piping installed in this tank system. "Safe gsuction" refers to piping systems meeting all <br /> requirements of 23 CCR§2636(a)(3)(also known as"European Suction"systems)(i.e.,sloped <br /> s tion piping <br /> i inmsastems ith no valves or Regulations sp pumps <br /> ow onligrade <br /> at <br /> and only one check valve,located below and as close as practical to the suction pump). <br /> www.calrees.com. <br /> 460. PIPING CONSTRUCTION-Indicate if the piping is single-walled or double-walled,or"other". <br /> 464. PIPING PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)underground product/waste piping, <br /> 464a. if you checked"Other"specify the type of primary containment in the space provided. <br /> 464b. PiPiNG SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(i.e.,secondary piping,trench) <br /> provided for the product/waste piping.For single-wall piping systems,check"None." <br /> 464c. 1f you checked"Other"specify the type of secondary containment in the space provided. <br /> 464d. PIPING/TURBINE CONTAINMENT SUMP TYPE-Indicate the type of piping/turbine containment sump(s).Check"None"if not present. <br /> 464e-el VENT PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i,e.,inner)vent piping. (Note:Address venting of the tank primary <br /> containment only.)Specify Other type of containment in the space provided. ( ) g secondary piping.)P <br /> 464f-fl VENT SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment systems (e. secundaprovided for <br /> the vent piping. For single-wall piping systems, check"None." (Note: Address venting of the tank primary containmentonly.) Specify Other type of <br /> containment in the space provided. <br /> 4648-g1 VR PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)vapor recovery piping. For tanks without vapor recovery <br /> piping(e.g.,Diesel tanks),check"None." Specify Other type of containment in the space provided. <br /> 464h-h I VR SECONDARY CONTAINMENT-Check the material(s)used to construct the secondary containment system(s)(e.g.,secondary piping)provided for the <br /> vapor recovery piping.For single-wall piping systems,check"None" Specify Other type of containment in the space provided. <br /> 4641. VENT PIPING TRANSITION SUMP TYPE-Indicate type of transition sump(s).Check"None"if not present. <br /> 464j-jI RISER PRIMARY CONTAINMENT-Check the material(s)used to construct the primary(i.e.,inner)piping for all risers(not drop tubes)other than annular <br /> space risers(i.e.,risers for filling or gauging of the primary tank). Specify Other type of containment in the space provided. <br /> 464k-kl RISER SECONDARY CONTAINMENT-Check the material(s)used to construct secondary containment system(s)(i.e.,secondary piping,sumps)provided <br /> for the riser piping.For risers without secondary containment,check"None." Specify Other type of containment in the space provided. <br /> 45la-c. FiLL COMPONENTS INSTALLED-Check the appropriate boxes to show that spill containment, tank bottom protection,and fill containment sumps(if <br /> applicable)are installed. r dispenser ons). if the system has no <br /> 469a. UDC CONSTRUCTION TYPE-Check the box to describe the type of dispenser containment system(s)(i.e., peraser sum s P or P <br /> dispensers(e.g.,standby generator tank system),check"No Dispensers" If the system has a dispenser,but no UDC,check"None". <br /> 469b. UDC CONSTRUCTION MATERIAL-Check the box to describe the materials used to construct the UDC. <br /> 469c. if you checked"Other"specify the construction material in the space provided. <br /> 448. STEEL COMPONENT PROTECTION-All systems contain some steel components. Check tite appropriate box(es)to describe all corrosion protection <br /> methods used. "Isolation"means electrical isolation from soil, backfill, and groundwater. Examples include fiberglass cladding, non-metallic secondary <br /> containment systems which isolate steel components from the sub-surface environment,and insulating bushings. <br /> APPLICANT SIGNATURE-The same person who signs the UST Operating Permit Application-Facility information Form shall sign in the space provided. This <br /> signature certifies that the signer believes that all information submitted is true and accurate, and that the UST system is compatible with the.hazardous <br /> substance stored. <br /> 470. DATE-Enter the date the form was signed. <br /> 471. APPLICANT NAME-Print or type the name of the person signing the form. <br /> 472. APPLICANT TiTLE-Enter the title of the person signing the form. <br /> Rev.(12/2007) <br /> UPCF UST-B-212 <br />