My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BUSINESS LOOP 205
>
5157
>
3500 - Local Oversight Program
>
PR0544135
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 10:34:41 AM
Creation date
2/12/2019 10:02:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544135
PE
3528
FACILITY_ID
FA0005488
FACILITY_NAME
STRONG, RUTH
STREET_NUMBER
5157
Direction
W
STREET_NAME
BUSINESS LOOP 205
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
5157 W BUSINESS LOOP 205
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� r <br /> 1 <br /> uIN. <br /> PUBLIC HVA' LTH SERVICES <br /> SAN JOAQUIN COUNTY z <br /> ENVIRONMENTAL HEALTH DIVISION `° 11IIWIIS =` <br /> Karen Furst, M.D., M.P.H., Health Officer + <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> RUTH STRONG MAR 3 12000 <br /> RUTH STRONG PROPERTY <br /> 330 E HOLLYWOOD <br /> TRACY CA 95376 <br /> RE: RUTH STRONG PROPERTY SITE CODE: 2054 <br /> 5157 W BUSINESS LOOP 205 <br /> TRACY CA 95376 <br /> San Joaquin County Public Health Services, Environmental Health Division <br /> (PHS/EHD) has reviewed Quarterly Report--September 1999 dated November 19, 1999 <br /> prepared by Advanced GeoEnvironmental, Inc. (AGE) for the above referenced site. <br /> Analytical results of the water sample collected from monitoring well ##2 (MW-2) were <br /> 130 ppb of Total Petroleum Hydrocarbon as Gasoline (TPH-g) and 68 parts per billion <br /> (ppb) of Total Petroleum Hydrocarbon as Diesel (TPH-d), 19 ppb of Benzene, falling <br /> from the highest concentrations of 5,800 ppb of TPH-g, 3,300 ppb TPH-d, and 1,200 <br /> ppb Benzene reported from the October 1998 sampling event. <br /> The extent of the contamination in groundwater has not been defined. It is unknown <br /> if migration of the groundwater contamination plume is the reason behind the <br /> continuous reduction of concentrations of analytes detected in the monitoring well <br /> water samples. On July 7, 1999, the Work Plan Addendum -June 1999 dated July 1, <br /> 1999 prepared by AGE, was approved by PHS/EHD with conditions. One of the <br /> conditions was that the proposed work be commenced by August 30, 1999. The work <br /> plan approval was sent to AGE via facsimile on.July 20, 1999. In a telephone <br /> conversation, AGE requested an extension to the deadline to commence the proposed <br /> work in your behalf. PHS/EHD agreed to extend the deadline to November 1, 1999. <br /> In a telephone conversation on November 29, 1999, AGE again expressed that you are <br /> unable to proceed with the proposed work due to financial reasons. AGE stated that <br /> you had not received reimbursement for costs of the previous work performed from <br /> the State Petroleum Underground Storage Tank Cleanup Fund (the Fund), but would <br /> proceed with the proposed work when you do. PHS/EHD agreed to delay the <br /> commencement of the work. PHS/EHD cautioned that such delay cannot be <br /> maintained indefinitely, and that the work must commence regardless of the status of <br /> the Fund reimbursement. This work has not commenced to date. <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.