Laserfiche WebLink
Ruth Strong -2- July 12, 1999 <br /> investigative workplan/Corrective Action Plan (CAP) before performing any work. This phasing <br /> process and the workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective, efficient and <br /> timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action ` <br /> alternative before any corrective action work was performed; and <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> the regulatory agency to achieve the minimum cleanup necessary to protect human health, safety and <br /> the environment. <br /> i_.��,;,t;..,.�,,,....����., �,�,� �..� .,. ,.� �.�- - ...—�.-.��=�^,a,.°.5';•'.!,�,,..c�._-�-,��,.r:..��+�'a,...3-.��-=:- rte:,_:'..�:�.. _.._--�.. _In some some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of theproposed action, and; (2) <br /> I complying with any requirements that the regulatory agency may set: Interim remedial action should <br /> only be proposed when necessary to mitigate an immediate demonstrated hazard.Implementing interim <br /> remedial action does not eliminate the requirement for a CAP and an evaluation of the most cost- <br /> effective <br /> osteffective corrective action alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to <br /> protect human health, safety and the environment can be claimed for'ireimbiirsement. You must comply <br /> with all regulatory agency time schedules and requirements and you#must obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to obtain preapproval of costs for <br /> all fixture corrective action work. If you do not obtain three bids and cost preapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. . <br /> E <br /> If you have any questions,please contact me at(916) 227-4411. <br /> Sincerely, <br /> Claims Review Unit y' <br /> Underground Storage Tank Cleanup Fund <br /> f <br /> cc: Mr. Gordon Boggs Ms. Mar' ret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton,'.CA 9201 . <br /> C ,F <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br /> f <br />