Laserfiche WebLink
0 <br />Daily Inspection Log For Tank Systcms <br />By initialing in the box below I ccv-tify that I have conducted an inspection in accordance with 22 CCR Seclion 66265.195(a). <br />Specifically this inspection included inspection of the following items: <br />1) overfill Ispill control equipment <br />2) Aboveground portions of the tank system to detect corrosion or releases of waste <br />3) Data gathered from monitoring equipment arLd leak detection equipment to "sure that the tank system is being operated <br />according to its design; <br />4) The construction materials and the area immediately surrounding the externally accessible portion of the tank system including <br />secondary containment structures to detect erosion or signs of releases of hazardous waste. . <br />5) For uncovered tanks, the level ofwaste in the tank, to ensure compliance with section 66265,194(b)(3). <br />Jan. <br />Apr. <br />May <br />June <br />July <br />Aug. <br />Sep. <br />Oct, <br />Nov, <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />9 <br />lil <br />12 <br />13 <br />t <br />14 <br />is <br />lfi <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />