My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0031201
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2500 – Emergency Response Program
>
CO0031201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 9:25:24 AM
Creation date
2/13/2019 11:18:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO0031201
PE
2546
FACILITY_ID
FA0007644
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
NOT IN PV
ENTERED_DATE
11/3/2009 12:00:00 AM
SITE_LOCATION
2700 W WASHINGTON ST
RECEIVED_DATE
11/3/2009 12:00:00 AM
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\2700\CO0031201.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> _ Stantec Consulting Inc. <br /> 3017 Kilgore Road, Suite 100 <br /> Rancho Cordova, CA 95670 <br /> Tel: (916)861-0400 <br /> Fax: (916)861-0430 <br /> Stantec <br /> January 28, 2010 <br /> Mr. Brian Taylor <br /> Regional Water Quality Control Board— Central Valley Region <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, California 95670-6114 I� ECiNED <br /> Reference: Fuel Release Waste Disposal Documentation 0 2 2010 <br /> BP Stockton Terminal No. 40T <br /> 2700 W. Washington ENV1RUNMENT HEALTH <br /> Stockton, California PERMIT/SERVICES <br /> Stantec Project Number: 211600194.200.0002 <br /> Dear Mr. Taylor: <br /> On behalf of BP West Coast Products LLC, Stantec Consulting Corporation (Stantec), is <br /> submitting the waste disposal documentation for material recovered following a fuel release at <br /> BP Stockton Terminal 40T (the `site') on November 3, 2009. For information regarding the <br /> release, please reference the Stantec Product Release Report dated December 4, 2009. <br /> Following the fuel release, a total of three 55-gallon drums were filled with excavated soil. One <br /> additional 55-gallon drum was filled with sampling debris and plastic wrap. The drums were <br /> transported under a Uniform Hazardous Waste Manifest on December 17, 2009 to the Heritage <br /> Environmental Service's landfill location in Coolidge, Arizona. The disposal documentation is <br /> presented in Attachment A. <br /> Sincerely, <br /> Stante suiting Corporation <br /> David Stolcenberg <br /> Engineering Project Specialist <br /> ATTACHMENTS <br /> Attachment A -Waste Disposal Documentation <br /> cc: Mr. Paul Supple, Atlantic Richfield Company (upload to Enfos) <br /> Mr. Mike Peterson, BP Stockton Terminal, 2700 West Washington Street, Stockton, CA <br /> Ms. Muniappa Naidu, San Joaquin County Environmental Health Department <br /> file:40T Waste Manifest.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.